mio
Uploaded by
16 SLIDES
258 VIEWS
160LIKES

Exploring Forces, Motion & Universe in Physics

DESCRIPTION

Dive into the world of Physics with a focus on forces, motion, and understanding the universe. Learn about distance, time, speed, and the scientific method. Explore how energy affects systems and uncover the fundamental laws governing the physical world.

1 / 16

Download Presentation

Exploring Forces, Motion & Universe in Physics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Physics A First Course Forces and Motion Chapter 1

  2. Forces and MotionDescribing the Physical Universe • 1.1 What is Physics? • 1.2 Distance and Time • 1.3 Speed

  3. natural law experiment analysis mass system variable macroscopic scientific method independent variable dependent variable hypothesis controlled variable experimental variable model Explain what makes up the universe. Describe how the scientific method is used. Explain the effects of energy on a system. Chapter 1.1 Objectives and Vocabulary

  4. Key Question: How is motion described and measured in Physics? 1A Investigation: Time, Distance, and Speed *Students read text section 1.2 AFTER Investigation 1A

  5. 1A Investigation Topics • Learn uses and functions of CPO Timer and photogates. • Set car to travel at constant speed. • Measure time intervals. • Calculate speed from time interval measurements. • Graph position vs. timer for car traveling down track.

  6. distance length English system metric system time interval second Express distance measurements in both English and metric units. Measure time intervals in mixed units. Distinguish between independent and dependent variables. Construct graphs. Convert between different units of time. Chapter 1.2 Objectives and Vocabulary

  7. Key Questions: Why do things change? Why do things change by only a certain amount? 1B Investigation: Systems, Energy and Change *Students read text section 1.3 AFTER Investigation 1B

  8. 1B Investigation Topics • Measure time intervals. • Calculate speed from time interval measurements. • Identify variables in an experiment. • Identify dependent and independent variables. • Control variables in an experiment. • Compare speeds and energy of car.

  9. speed constant speed Define speed. Express an object's speed using various units. Calculate speed, distance or time given two of the three quantities. List the steps for solving physics problems. Chapter 1.3 Objectives and Vocabulary

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer