Project of construction work Church of the Nazarene

Project of construction work Church of the Nazarene. “C UTERVO – CAJAMARCA -PERU”. Geographic Location. Cutervo, province of the departament of Cajamarca , has a population of about 138 thousand people. CURRENT STATE OF THE TEMPLE.

chace
Download Presentation

Project of construction work Church of the Nazarene

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project of construction work Church of the Nazarene “CUTERVO – CAJAMARCA -PERU”

  2. Geographic Location Cutervo, province of the departament of Cajamarca , has a population of about 138 thousand people.

  3. CURRENT STATE OF THE TEMPLE The temple has 3 floors of rustic material, that is, adobe and stone. It is 45 years old. DECLARED IN EMERGENCY BY CIVILDEFENSE

  4. DESIGN OF CONSTRUCTIÓN Construction Project Cost S/. 800 000 40 % self- finacing nature 60 % national & international help.

  5. FINAL CONSTRUCTION TEMPLE 3 floors of 15 x 30 meters First floor: a public funeral awake. Second floor: A mini auditorium and clasrooms for workshops. Third floor:Temple, Pastoral and administrative house.

  6. THANKS Withyourhelp, wewillgetourdream and getting soulsfortheKingdom of Christ. Committee pro-construction