Rajasthan State Road Development
Download
1 / 48

- Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road - PowerPoint PPT Presentation


  • 101 Views
  • Uploaded on

Rajasthan State Road Development & Construction Corporation Ltd. - Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road. BLG Construction Services (P) Ltd. AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY. Project Location. Gotan.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '- Development of - Gotan-Pundlu-Borunda-Ransigaon - Khariameethapur-Bilara-Sojat Road' - zamora


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Rajasthan State Road Development

& Construction Corporation Ltd.

- Development of -

Gotan-Pundlu-Borunda-Ransigaon-

Khariameethapur-Bilara-Sojat Road

BLGConstruction Services (P) Ltd

AN ISO 9001-2000 CERTIFIED COMPANY FOR CIVIL ENGINEERING CONSULTANCY


Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Project Location

Gotan

Borunda

Khejarla

Bilara

Sojat


Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Project Map

Gotan

Borunda

Khejarla

Bilara

Sojat


Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Necessity of The Project

This route Carries Heavy Mining and Industrial Traffic. A large number of lime, cement and chemical Industries nearly more than 100 are situated on this road. Besides this a large number lime stone quarries are also situated in the surroundings of this Road.

The road caters for raw and finished lime product transportation. The area is agriculturally rich and improvement of this road will reduce the operation and maintenance cost of vehicles plying over this road.



Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Study Objective

  • Development of the road as two laning with paved shoulder or earthen shoulder.

  • Determining technical feasibility & financial viability.

  • Development & Construction of project highway with project facilities, enhanced safety & Level of services.

  • To ensure minimum adverse impact on local population, road users & environment .

  • Phased development of project highway for improving its financial viability with minimum inconvenience to traffic if additional work are undertaken within 7 years.



Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

Work Done Till Date

  • Reconnaissance Survey Completed

  • Mobilization of Staff

  • 7 Days Traffic demand assessment and classified Traffic Volume count work completed, Intersection volume count completed, Pedestrian crossing completed. Axle load Spectrum completed.

  • Topographic, Alignment and Land use survey completed for 70km of project road. Bridge & road condition survey completed.

  • Geotech, material, hydrology, drainage survey in progress

  • Inspection of available records completed.

  • Land Plan survey under preparation.

  • Environment and social impact study in progress.




  • Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Project Description

    • Project Road is Road from Gotan to Sojat Via Pundlu – Borunda

    • Project Road is having total length of 93 Kms.

    • Project Road length is 23 KM in district Nagour.

    • Project Road length is 58 KM in district Jodhpur & 12 KM in Pali


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Project Description contd..

    Project Road passes through town villages as below :

    • Predominant land use is agriculture.

    • Structures are generally in good condition.

    • Minor bridges and pipe culverts shall have to be reconstructed / widened.

    • Flush Causeways will be replaced by Culverts.

    • Bypass at Ransigaon-Hariadhana and pundlu are proposed.

    • Construction of CC road in Borunda mining area and other water logged village portions.



    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Physical Features contd..

    • Formation Width

    • Various from 10 M to 12 M

    • Carriageway Width

    • KM 0/0 – 22/0 5.5 M

    • KM 22/0 – 26/0 Kuccha/Damaged

    • KM 26/0 – 45/0 3.75 M

    • KM 45/0 – 53/0 5.5 M

    • KM 53/0 – 62/0 3.75 M

    • KM 62/0 – 63/0 7 M

    • KM 63/0 – 93/0 5.5 M

    • Crust Thickness

    • WBM - 150 MM

    • GSB - 300 MM to 230 MM

    • B.T. - 20mm PMC

    • CBR

    • 10.0%




    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Photos

    Starting Point at Gotan

    Pipe Culvert

    Kacha Track in

    Mining Area Borunda

    Flush Causeway

    Intersection at Dhanapa


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    ALIGNMENT THROUGH TOWN/VILLAGES

    The alignment passes through village Gotan-Pundlu-Borunda-Hariadhana-Ransigaon-Murkasni-Jhaak-Khariameethapur-Bilara-Barna and Atpada. Bypass is proposed at Ransigaon.

    Road Geometrics Improvement proposed near village Pundlu and at road from Pundlu to Borunda.



    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    GOTAN TO BORUNDA

    N

    To Merta

    Total Length - 28KM

    Gotan

    To Merta

    RAM NAGAR

    Village

    Dhanapa Crossing

    To Jodhpur

    Pundlu Village

    Toll Plaza

    BasniSejan Crossing

    Borunda


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Road Geometrics Improvement

    Existing Length = 850m

    PUNDLU

    Existing Length = 225m

    Proposed Length = 525m

    Proposed Length = 105m

    Existing Road

    Proposed Road


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Road Geometrics Improvement

    Proposed Length = 515m

    Existing Length = 950m

    Existing Road

    Proposed Road


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    BORUNDA TO KHEJARLA

    BORUNDA

    (VIA: RANSIGAON)

    (LENGTH - 27KM)

    To MERTA

    To PIPAR

    N

    Toll Plaza

    HARIADHANA

    RANSIGAON

    To SH-21

    To PIPAR

    To KHARIYA

    METHAPUR

    To GAHNAMAGARA

    VILLAGE

    KHEJARLA


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    RANSIGAON TO

    KHARIAMEETHAPUR

    (LENGTH - 20KM)

    MURKASNI

    RANSIGAON

    N

    JHAAK

    RIVER

    RIVER

    Toll Plaza

    UDALIYAWAS

    To JAIPUR

    NH 112

    To JODHPUR

    NH 112

    KHARIAMEETHAPUR


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Proposed bypass at Ransigaon

    TO BORUNDA

    Existing Length = 2470m

    EXISTING TRAFFIC FLOW

    PROPOSED TRAFFIC FLOW

    Prop. Length = 1800m

    TO kHEJARLA

    RANSIGAON

    Existing Length = 3130m

    Prop. Length = 2500m

    TO KHARIAMEETHAPUR

    Existing Road

    Proposed Road


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    KHARIAMEETHAPUR TO BILARA

    To JAIPUR

    (LENGTH - 3KM)

    KHARIAMEETHAPUR

    N

    NH 112

    To JODHPUR

    NH 112

    To JAITARAN

    Bilara

    To SOJAT

    To NH-14


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    TO DEORIA VILLAGE

    BILARA TO

    SOJAT

    CHOPARA FEEDER

    TO HARSH VILLAGE

    Bilara

    BARNA

    (LENGTH - 30KM)

    N

    TO DEOLI KALAN

    Toll Plaza

    ATBARA

    TO CHITERYA VILLAGE

    RUNDIYA

    TO BOYAL

    MANDLA

    SH

    62

    SH

    58

    Toll Plaza

    RIVER

    Sojat

    NH

    14

    RIVER



    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Traffic Data Collection


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Gotan to Borunda


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Borunda to Khariameethapur


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Khejarla to Khariameethapur


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Bilara to Sojat


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Traffic Projections

    As per IRC-37:2001 7.5% increase in traffic per Annum

    As per Model Concession Agreement 6% increase in traffic per Annum

    For pavement design :

    CBR : 10%

    VDF :

    BUS 1.5

    Truck 3.5

    LCV 1.5

    Hence for crust design purposes as per IRC-37:2001



    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Laning Requirement

    Capacity of 2 lane with earthen shoulder exhausting in year 2023 in respect of Borunda to Khariameethapur, in year 2025 in respect Bilara to Sojat and year 2030 in respect to reach from Gotan to Borunda hence to two lane with paved Shoulder will be required.


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Toll Plaza

    RSRDC


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Location of Proposed Toll Plazas

    • To make Toll realization realistic and to facilitate public of this area the entire road has been divided into 4 Toll Zones.

    • The Toll Plazas do not fall with in 10 Km Municipal Area

    • The Toll collected at one of the plazas will be verified at the other one.







    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Toll Realisation

    For Toll Realisation following exemption have been made

    Of the net Tollable Traffic 85% Toll realisation has been assumed in the project viability calculation.


    Development of gotan pundlu borunda ransigaon khariameethapur bilara sojat road

    Project Cost Repayment

    Project is viable