1 / 6

NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS

NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS. YEFB SPECIFICATION COOLING DUTY RANGE 4-24KW 2&4 PIPE SYSTEMS CHOICE OF 3 OR 4 ROW COOLING COIL HIGH STATIC PRESSURES – UP TO 250Pa MADE OF 1.0mm GALVANISED SHEET STEEL 10mm THICK CLOSED CELL FOAM INSULATION JCI VALVES (MODULATING OR ON/OFF).

Download Presentation

NEW! ‘YEFB’ HIGH PRESSURE BLOWER UNITS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEW!‘YEFB’ HIGH PRESSURE BLOWER UNITS

  2. YEFB SPECIFICATION • COOLING DUTY RANGE 4-24KW • 2&4 PIPE SYSTEMS • CHOICE OF 3 OR 4 ROW COOLING COIL • HIGH STATIC PRESSURES – UP TO 250Pa • MADE OF 1.0mm GALVANISED SHEET STEEL • 10mm THICK CLOSED CELL FOAM INSULATION • JCI VALVES (MODULATING OR ON/OFF)

  3. YEFB OPTIONS • PAINTED FINISH • DISCHARGE PLENUMS • CONDENSATE PUMPS • HANDED COILS • SUPPLEMENTARY HOT WATER OR ELECTRIC HEATER OPTION • RANGE OF ROOM MOUNTED CONTROLLERS • F5 FILTER OPTION

  4. YEFB PRICING COMPARISON YEFB gives better price vs. cooling capacity compared to previous YFB range nominal conditions are referred to : e.s.p. =50/100 Pa dependent on unit size , air temperature = 27/19 °C , water temperature = 7/12 °C , 2 pipe system at medium speed.

  5. YEFB PRICING COMPARISON YEFB also gives better price per Kw compared to previous YFB range nominal conditions are referred to : e.s.p. =50/100 Pa dependent on unit size , air temperature = 27/19 °C , water temperature = 7/12 °C , 2 pipe system at medium speed.

  6. YEFB PERFORMANCE DATA

More Related