1 / 25

TRT (and a bit beyond) – Overview

TRT (and a bit beyond) – Overview. A.Loginov , A.Romaniouk For the ATLAS TRT Collaboration. TRT Days June 25 2013. DQ @ 99.8% in pp @ 2012. TRT Desynchronization [ 206248 : 1 -> 206248: 533 ), elog ROD firmware issue Reverted to the before-the-TS settings to resolve the issue

vivian
Download Presentation

TRT (and a bit beyond) – Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TRT (and a bit beyond) – Overview A.Loginov, A.Romaniouk For the ATLAS TRT Collaboration TRT Days June 25 2013

  2. DQ @ 99.8% in pp @ 2012 • TRT Desynchronization • [206248: 1 -> 206248: 533), elog • ROD firmware issue • Reverted to the before-the-TS settings to resolve the issue • HV Crate issues • [215027: 1 -> 215027: 268) : (TRT_NODATA_06, HV Crate in the barrel tripped and had to be replaced) • [215414: 1 -> 215414: 163) : (TRT_NODATA_06, HV Crate tripped and had to be replaced) • An environmental / external issue? • Lacquered contacts in the end of last year, no problems since then • DQ @ 100% in other runs, despite gas leaks and minor problems • Got a number of tolerable defects (TRT_BADGAS_01, TRT_BADGAS_02) • Number of dead channels Is stable • within declared 2.7% (2.4%) TRT Days, June 2013

  3. TRT DAQ in Run 2 • Goal: 100kHz trigger rate @ high occupancy • Bottlenecks: • Front End to ROD bandwidth • Changing from full readout mode (27 low threshold bits) to reduced mode (23 low threshold bits) increases trigger rate limit from 89 kHz to 105 kHz (ongoing activity) • Dropping last 4 LT bits – minimal impact on tracking (not losing the leading age) • ROD processing rate • Event processing time proportional to occupancy due to on-board compression • Solutions include: • Increasing clock speed from 80 MHz to 100 MHz on compression chip increases bandwidth • Hard-coding common words to decrease occupancy that compression chip must process • Applying validity gate on all words to decrease overall occupancy • ROD to ROS bandwidth • Extrapolation to high lumi indicates that this is not limiting factor • Optimization of compression table reduces load • Monitoring of fragment size in place TRT Days, June 2013

  4. Other TRT DAQ Issues • Increasing number of automatic resyncs during stable beams at end of 2012 (order once per hour) • May be caused by power instabilities in VME crate which affect sensitive components on ROD • Crates will undergo upgrade to increase current limits on relevant lines • Maraton LV power supply upgrades (connector upgrade and internal wire replacement) • Rolling upgrade to be completed during LS1, currently on-schedule • Sufficient number of spares TRT Days, June 2013

  5. Other TRT DAQ Issues • Increasing number of automatic resyncs during stable beams at end of 2012 (order once per hour) • May be caused by power instabilities in VME crate which affect sensitive components on ROD • Crates will undergo upgrade to increase current limits on relevant lines • Maraton LV power supply upgrades (connector upgrade and internal wire replacement) • Rolling upgrade to be completed during LS1, currently on-schedule • Sufficient number of spares TRT Days, June 2013

  6. eFastOr • Upgrade the existing FastOr trigger • https://cds.cern.ch/record/1516518 • Physics motivation: HIP (monopole, Q-ball…) • Potential timeline TRT Days, June 2013

  7. High Voltage • February’2012: crates 003 (tripped), found that crate 004 had similar damage • Crates in the same rack – external factor? • To solve the problem: HV pins were covered with lacquer • November’2012: Two issues caused by the same problem • Small debris of Al / dust found on the board • The issues got addressed (cleaning + protection lacquer), no problems since then • Have 3 spare crates (1 x USA15, 2 x SR1) • And a few spare HVM modules • Lacquer all the contacts to prevent similar issues • Ongoing activity TRT Days, June 2013

  8. Active gas issues • Excellent work of TRT active gas team • Despite all the leaks, the DQ didn’t suffer • TDR specs: Xe leak @ 100 l/day • Before early 2012 the leaks were a few times smaller • By the end of 2012 we got ~200 l/day • Leaks • Stress corrosion enhanced by Ozone presence • Strategy discussions since few months, study insitu / repair during last few weeks • Repair work finished TRT Days, June 2013

  9. Leaks Detector connector • Repaired whatever was accessible • Both EC Side C / Side A A1 crack along the pipe (PPF1 connector) PPF1 brackets TRT Days, June 2013

  10. EC wheel type A connectivity Electronics Electronics PEEK pipes shown in pink Gas OUT Gas IN Gas manifold Gas manifold Straws/radiator Straws/radiator Places of stress Gas Gas TRT Days, June 2013

  11. What’s then? • Will do our best to start running in 2015 with in Xemode only • Work is ongoing to automate active gas system operation • 80 channels to regulate • Adjustments of leaking channels have been done manually so far • Can we stabilize leaks at 150 l/h? • Ar affects quite a few physics aspects (TR!) • Had a combined Ar / Xe mode of operation in 2013 to study • Will post a note summarizing this in the coming days • Electron ID, triggers are affected… • What about tracking with Ar? TRT Days, June 2013

  12. XevsAr: Tracking • Resolution (tracking @ Ar is not affected) • Run 218391: Ar/CO2/O2 @ 80/17/3, HV @ 1365 V • Barrel: 0.123 mm (Xe) / 0.131 mm (Ar) • EndCap: 0.123 (Xe) / 0.127 (Ar) TRT Days, June 2013

  13. Active Gas System: Ar studies • Studies with both the TRT and at test stands • measurements of signal shapes for different gas mixtures and ASDBLR shaping options (report by X.Povedalink) • Main conclusion: afterpulses at 100 ns after the main pulse are observed if Xe shaping has to be used, more pronounced for high HV values • Different mixtures, HV settings (report by K.Vorobevlink) • Study stability, gas gain limitations etc TRT Days, June 2013

  14. TRT DCS • Very successful operation in Run 1 • Quickly prepared tools for Xe/Ar combined running • Massive upgrades planned for LS1 (report by E.Banaś, Z.Hajduk, J.Olszowskalink) • As a part of general DCS upgrade (windows -> linux etc) • Need to develop some TRT specific tools • Constraints from central DCS • Overall strategy for the LS1 upgrade • Fully reversible upgraded <-> old DCS • All the time most of TRT hardware is under control • Also will upgrade GGSS (report by B.Mindurlink) • Standard PCs, exchange of all existing internal PCI cards to internal ones, can replace straws if needed • All proposed HW components are linux/windows compatible • Need to rewrite the core of GGSS so that it runs on linux TRT Days, June 2013

  15. LHC: Run 2 TRT Days, June 2013

  16. ATLAS: Run 2 • Many discussions on how to operate ATLAS • See the “ATLAS Post-LS1 Operation Workshop” https://indico.cern.ch/conferenceDisplay.py?confId=256916 • Fewer shifters • More information to look at (muon system will be completed + IBL + etc) • Better tools / more uniformity (or more headache during the operation) • Updates of the CR layout, calibration procedures, shifters’ training etc etc etc • Will be (again and again) asking for inputs to make sure that TRT is properly taken care of by the shift crew TRT Days, June 2013

  17. Summary • Run 1 was success • Thanks to all the expertise and dedication of the TRT team: the team made the TRT a great detector! • Will have things ready for the Run 2 • DAQ updates: get ready for high occupancies and rates (ongoing) • Hardware and firmware improvements • Improved Maratons, HV crates, etc • Active gas system • Possible repairs are (almost) done, have more work ahead (automation and optimization) • Studies of Ar mixture, possible modes of operation are ongoing • eFastOr is progressing well TRT Days, June 2013

  18. TRT BBQ this WEDNESDAY @ 18h • BBQ site @ Prevessin: • Map @ https://maps.cern.ch/mapsearch/mapsearch.htm?no=[9401] • Sign up @ http://doodle.com/wft6cuha4gxreu9y TRT Days, June 2013

  19. Few backup slides TRT Days, June 2013

  20. Active Gas System Plans • Possible to stabilize most leaks. Need to control 2 parameters: • gas flow in a leaking channel • Remote flow regulation? • pressure in the TRT outlet (pump inlet pressure) • Need 0.005 mbar accuracy (with the original requirement of 1 mbar) • precise pressure sensor • additional buffer for pressure sensor • pump input resistance regulation • cavern-USA pressure difference feedback to the pump operation • Ar mixture blow out setup • Have a temporary setup operating for the pPb running • Automate N2 removal (because of the TRT leak) TRT Days, June 2013

  21. TRT Performance in Heavy Ion runs • Excellent performance even with extreme occupancies (plots taken from link) TRT Days, June 2013

  22. TRT DCS: PCs, Systems and HW… A “simple” drawing TRT Days, June 2013

  23. XevsAr Saga • Put Ar in few parts of the detector (both in barrel and EC) • Prepare tools / Learn from the operation / Save Xenon • Vary gas mixtures / HV settings to study operation • Studies with the TRT and on a test stand • Argon shaping issue • Mis-stuffed resistors in a fraction of EndCaps (and hence bit problems) • Under studies • Xe->Ar => electron ID is affected • Argon can be operated with larger gain than Xe • Electron Drift-time for Ar is shorter than Xe • Transition Radiation absorption down by ~10 compared to Xe • Need to understand the consequences TRT Days, June 2013

  24. XevsAr Saga: PID • This is under study, but here are few points below • No TRT seeding hits for conversion finding => CPU time for conversion finding increases by a factor of 10 • Overall, back tracking is affected • High-PT electron trigger affected • Increase by 20-30% without HT hits information @ HLT • Jpsi -> ee trigger affected • Rates increase by a factor of 2 • So…many things to try • Find / repair the leaks @ EC • AND Cheaper Xenon (30% lower price) from the Russian supplier? • AND Optimize performance / study combined Xe / Ar operation effect on physics / etc TRT Days, June 2013

  25. Leak Hunt and More: few Dates • 8-13 March • ID End-plate leak search (CO2) • 18 April – September • TRT gas leak repair work • Developing tools… • 18 February – November 2014 • Active gas racks test / modifications etc • Replacements ofMaratons • PP2 replacement/tests/repair TRT Days, June 2013

More Related