1 / 23
Download Presentation

SUBMARINE CONTROL SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUBMARINE CONTROL SYSTEM Imran Ali Namazi Final Year Electrical KCG College of Technology

  2. Project Timeline IAN = Imran Ali Namazi; KP = K.P. Subramanian

  3. Project Report Excerpt Taken from Chapter 1.2 “Literature Survey” on page 4

  4. Other Projects *These projects are listed here as illustrative of the areas in which skills have been picked up and to show how valuable they were over the course of our submarine project.

  5. Projects - Speedo • for my bicycle - using dynamo as i/p • 2 digit display (99kph / 9.9km) • Display using 4518 / 4511 • 40106 to generate latch & reset • 4040 / 4068 for division (÷8 for speedo & ÷1440 for odo) • Acrylic cabinet and Al. mounting

  6. Projects – Nathella* • 4 Channel Clock • Hourly Chime • Battery Backup • Lighting Control *Worked only as assistant. Helped in developing, fabrication, testing and commissioning.

  7. Projects – IViewer (VB6) • Capable of viewing Images, Html, Text, Office, PDF mp3 & even videos. • Built in File Explorer • Knowledge of shell, API, registry • Uses listview, treeview, icons toolbar options dialog, paning etc. • Current version 3.5.394 (394 builds) • Over 6000 lines of code

  8. Projects – Inventory

  9. Projects – Room Alloc (NLDS)

  10. Projects – Buzzer (mP)

  11. Projects – Buzzer (mP) • Single digit (Max 8 contestants) • Stores sequence of pressing. • Can scroll up/down to Learnt: ALP, mP based system design Learning /Development Time 1.5m

  12. Projects – EmpEX

  13. Projects – Micromouse

  14. Projects – Micromouse • 6 legged • Aluminum frame • 2 IR-LEDs for detecting obstacles • 3 servomotors • (left legs, right legs & tilt legs) • Done in conjunction with Narendran and Sriram, • 3rd year Sathyabama Engineering college.

  15. Projects – Energy Meter (mP)

  16. Projects – Energy Meter (mP) • 3 digit multiplexed display • Opto-coupler as input. • Switches to show rate • Uses recursion for addition • Optimized algorithm for multiplication.

  17. Delphi Model

  18. THANK YOU • Also in the presentation: • Testing Videos (Lafayette) • Software Demo (Delphi) • Buzzer (OHP) • Other Projects (on request) • Assembly Programming (e-Meter)

More Related