This document provides a comprehensive overview of the LCLS undulator system, focusing on the schematic baseline layout and organization. It details the roles of project directors, division directors, and key personnel involved in the development of the undulator systems. The report outlines the status of fully characterized prototypes, value engineering efforts, and the acquisition and delivery plan for critical components. Long-lead procurements and industrial partnerships are also discussed, ensuring successful tuning and installation at SLAC.
E N D
Undulator System Overview Stephen Milton
Management: Organization APS J.M. Gibson Assoc. Lab. Director LCLS Undulator S. Milton Project Director LCLS Project J. Galayda Project Director D. Walters Vacuum/Diagnostics CAM H.D. Nuhn Undulator System Physicist Accel. Systems. Div. R. Gerig Division Director Exp. Facilities Div. E. Gluskin Division Director M. White Magnet Systems CAM R.Ruland/MMF J. Welch/Fixed Support CAM APS Operations Div. W. Ruzicka Division Director J. Stein Controls CAM
Undulator: Prototype Status • Value Engineered Thoroughly • Most recently • Wingless poles • Aluminum magnet block/pole holder simplification • All measurement tested • Including before and after transporting
Acquisition/Delivery Plan • Undulators • Prototyped and Thoroughly Tested • Long-Lead Procurements • Ti Strongback • Magnet Blocks • Magnets Poles • 1st Article in industry before production run (FY05) • Assemble in industry • Deliver to SLAC MMF • Measure/tune at SLAC • Handover of responsibility to SLAC following successful tuning • Install
Undulator: Status of LLPs • Statement of Work • Complete for Ti stongback • Near complete for the poles and the magnet blocks • Federal Business Opportunities (FedBizOps) • Requests for interest released • Will be used to qualify vendors • See other’s talks for many more details