LBT Q1 2007 Engineering Review

LBT Q1 2007 Engineering Review. BGG Bogie Alignment. Summary. Excessive rail flaking Causes? Misalignment Materials. Known: Material hardness good Bogie A has built-in tilt Design is reasonable. Highlights (Q1/2007). No significant activity in Q1/2007

naiara
Download Presentation

LBT Q1 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q1 2007 Engineering Review BGG Bogie Alignment

  2. Summary • Excessive rail flaking • Causes? • Misalignment • Materials • Known: • Material hardness good • Bogie A has built-in tilt • Design is reasonable LBT Q1 2007 Engineering Review

  3. Highlights (Q1/2007) • No significant activity in Q1/2007 • Monitored section cleaned in 12/2006 • Contacted experts • UA Materials Science department • Rail, transportation industry • Keck Observatory • Vertex RSI LBT Q1 2007 Engineering Review

  4. Open Issues • Technical • Root cause of flaking still unknown • No obvious solution identified • Any adjustment will affect entire building • Schedule • No repair planned • Cleaning and monitoring should be performed periodically by operations staff LBT Q1 2007 Engineering Review

  5. Open Issues (cont.) • Financial • None • Resource • Ongoing cleaning and monitoring task must be assigned • Record of enclosure usage/rotations would be useful if feasible in software LBT Q1 2007 Engineering Review

  6. Progress (Q1/2007) • Discussed issue informally with 4-5 experts • Flaking is normal • Lubrication recommended • Debris removal important • Other observatories experience same problem • Potential corrections are extremely costly, disruptive, and risky • Recommend passive monitoring LBT Q1 2007 Engineering Review

  7. Planning (Q2/2007) • Continue to monitor “cleaned” area • Clean rest of rail if return of flaking is slow • Include rail cleaning and debris removal in regular preventive maintenance LBT Q1 2007 Engineering Review