An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q1 2007 Engineering Review ALPC – Primary Mirror Aluminum Shooting

  2. Highlights (Q1/2007) • Got some documentation, in the form of a PowerPoint LBT Q1 2007 Engineering Review

  3. Open Issues • Technical • Documentation for Aluminization System • Upgrade of Aluminization System • Cleaning/Stripping System • Schedule • Aluminizing to occur some time in July or August? • Financial • None • Resources • None LBT Q1 2007 Engineering Review

  4. Progress (Q1/2007) • In addition to the Highlights • Bell Jar Stand Modification Design LBT Q1 2007 Engineering Review

  5. Planning (Q2/2007) • Aluminizing in Q3 • Belljar Stand Modification LBT Q1 2007 Engineering Review

  6. Belljar Stand Modification LBT Q1 2007 Engineering Review