An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q1 2007 Engineering Review RSU Rigid Secondary Units

  2. Highlights (Q1/2007) • Hexapod #3 Accepted and shipped to OSU LBT Q1 2007 Engineering Review

  3. Open Issues • Technical • None • Schedule • Mirror polishing running late • LBTO supplied hub • Financial • None • Resource • Telescope availability for installation/alignment LBT Q1 2007 Engineering Review

  4. Progress (Q1/2007) • Mirror support designed (OSU) • Flexure analysis (OSU) • Mirror support fabrication • Hexapod finished LBT Q1 2007 Engineering Review

  5. Planning (Q2/2007) • Ship mirror to OSU • Install flexures in mirror (OSU) • Begin lab integration (OSU) LBT Q1 2007 Engineering Review