SMS Test Phase 2 & 3

WFC3 FSW and STScI Development Flow through SMGT. 3/1/02-5/31/02. 6/3/02-7/31/02. 7/8/01-8/15/01. 8/16/01-11/17/01. 12/15/01-4/4/02. 12/3/01 - 2/27/02. 11/1/01-1/17/01. 4/2/01-7/30/01. Boot Code Testing. FSW 3.0 Component Test. FSW 3.0 C&UT. FSW 2.1 C&UT. FSW 2.1 C&UT.

maddox
Download Presentation

SMS Test Phase 2 & 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WFC3 FSW and STScI Development Flow through SMGT 3/1/02-5/31/02 6/3/02-7/31/02 7/8/01-8/15/01 8/16/01-11/17/01 12/15/01-4/4/02 12/3/01 - 2/27/02 11/1/01-1/17/01 4/2/01-7/30/01 Boot Code Testing FSW 3.0 Component Test FSW 3.0 C&UT FSW 2.1 C&UT FSW 2.1 C&UT FSW 2.3 C&UT Final Qualification Test FSW 2.2 C&UT - SES 1 Board (due 10/29/01) - WFC3 TBD Bench - SITS - WFC3 TBD Bench - SITS - COS Bench - SITS - WFC3 Software Bench - SITS - WFC3 TBD Bench - SITS - WFC3 Software Bench - SITS FSW 2.3 Component Test FSW 2.1 Component Test FSW 2.2 Component Test 8/16/01-10/31/01 10/31/01-2/28/02 Ship to GSFC ~8/15/02 4/1/02-6/30/02 9/1/02-12/31/02 2/1/03-4/30/03 11/15/02-4/30/03 SMS Test Phase 2 & 3 SMS Test Phase 4 & IR Subarrays SMS Test Phase 5 Pre-SMGT Bench Testing Continued on the Next Page • WFC3 TBD Bench • - SITS • Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • SITS • - Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • - SITS • - Database (CCL, Cmd, TLM, Tables) • - Macros • - FSW 3.0 • WFC3 TBD Bench • - SITS • - Database (CCL, Cmd, TLM) • - Macros • - FSW 3.0

  2. WFC3 FSW and STScI Development Flow through SMGT - concluded TBD NSSC AP’s TBD VEST Dry Run • - VOCC/CCS • VEST • Bench? TBD No earlier than 5/1/03 TBD VEST I&T SMGT VEST I&T From Pre-SMGT Bench Testing • - WFC3 Instrument • - SMPRD Database • - Macros • - VOCC/CCS • FSW 3.X • VEST • PACOR/STScI • - WFC3 Instrument • - SMPRD Database • - Macros • - STOCC/CCS • FSW 3.X • VEST • PACOR/STScI • - S/W or Ops Bench • - SMPRD Database • - Macros • - VOCC/CCS • FSW 3.X • VEST • PACOR/STScI TBD PRD Office • - Commands • Telemetry • Tables • CCL’s • Display Pages

  3. WFC3 FSW Development Flow (2.1 through 2.2) CCS 3.4.0.3 SITS 1 5.4 (S/W Bench) 7/31/01 WFC3 S/W Bench MEB 8/16/01-10/31/01 7/2/01-8/31/01 FSW 2.1 C&UT Component Test 2.1 FSW 2.1 consists of - Telemetry (5/15/02) - BMM (5/15/02) -Limit Checking (2/8/02) -Mem/Image Dump (2/8/02) - Command (11/14/01) - Memory Load/Copy (2/13/02) - Error Handling (5/3/02) Dates are component test complete from 10/19/01 schedule - S/W Bench - SITS DRD Items 10/1/01 DRD Items SITS 2 5.4.1 (Ops Bench) 10/1/01-11/16/01 10/1/01-12/15/01 WFC3 Ops Bench - DM-06 (Initial) Boot Code C&UT Boot Code Testing Hardware 10/15/01 MEB 2 - SES2 (10/19/01) - SES3 (9/14/01) - SES4 (9/7/01) 10/29/01 SES 1 Board 8/16/01-11/15/01 FSW 2.2 C&UT FSW 2.2 consists of - Sys Init & Service Functions (4/30/02) - Mech & Lamps (Part 1) (2/25/02) Dates are test complete from 10/19/01 schedule Mechanisms (Test Software) 10/31/02- 1/28/02 • - SOFA/Corrector (10/17/01) • - Shutter (10/17/01) • Filter Wheel (10/19/01) • - Mech Sim1 (10/1/01) FSW 2.2 Component Test To FSW 2.3 Code & Unit Test

  4. WFC3 FSW Development Flow (2.3 through System Functional Test) From FSW 2.2 Component Test DRD Items - TBD 12/1/01-3/31/02 11/16/01-1/15/02 Hardware FSW 2.3 Component Test WFC3 System Functional Test (MEB Install) FSW 2.3 C&UT FSW 2.3 consists of - (11/16/01) Normal Engineering Data (NED) - (4/19/01) Diagnostics - Mech & Lamps (Part 2) (4/29/02) CSM & IR FW (2/26/02) Lamps Dates are Unit Test complete on left from 10/19/01 schedule - SES1 (10/29/01) - SES2 (9/14/01) Mechanisms (Test Software) • CSM (11/19/01) • - Mech Sim2 (11/15/01) FSW 3.0 consists of - (5/10/02) IR detector (5/31/02) - (4/19/02) UVIS detector (6/12/02) Dates are Build, Install & Verify on left, “run for record” on right from 10/19/01 schedule WFC3 System Functional Test (Surrogate Detector Install) DRD Items - TBD 11/1/01-3/15/02 3/1/02-9/30/02 6/13/02-8/17/02 8/15/02 Support FSW 3.0 Component Test FSW FQT SI Delivery to GSFC FSW 3.0 C&UT -TBD Bench - UVIS/IR Detector Simulator (9/21/01) - UVIS/IR Science Data Generator(12/1/01) -TBD Bench DRD Items Procedures not fully component tested in 3.0 can be run against the hardware if the procedure is dry run on the bench first. Mechanisms - Need List of Deliverables - TBD

  5. WFC3 STScI Ground System Support Development Flow (Phases 2 – 4) 1/1/01-6/30/01 7/1/01-12/31/01 Phase 2 Phase 3 development FSW 2.2 Macro Timing • - Aperture Definitions • - Basic UVIS ACCUM Mode • UVIS Dark and Bias Calibration - Basic IR MULTIACCUM Mode - IR Dark Calibrations - UVIS & IR Lamp Operations Macro Timing 4/5/02-7/4/02 FSW 2.3 Phase 2 & 3 SMS Test Window Macro Timing FSW 3.0 7/1/02-10/1/02 Initial Phase 5 Development 1/1/02-6/30/02 - IR Subarrays - SMGT Preparations - SMOV Special Commanding DRD Items Phase 4 development • UVIS & IR ALIGN Mode • Timing Updates • SAA Contour Defintions • UVIS CTE Monitoring • IR Bright Earth Avoidance - DM-06 (Initial) Support 9/2/02-11/29/02 Remainder of phase 5 and phases 6 & 7 development (needed post Launch) Phase 4 & Initial Phse 5 SMS Test Window - Detector Simulator - Science Data Generator SMGT No earlier than 5/1/03