Tests Front-end Status

Tests Front-end Status. Necessity of Test board Test board architecture Time adjustement with delay chip and Input/Output (LEMO) Analog Front-end mezzanine FPGAs and interfaces Clock tree Test board power supply Test board layout status Test board pending question Analog mezzanine …

korene
Download Presentation

Tests Front-end Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tests Front-end Status Necessity of Test board Test board architecture Time adjustement with delay chip and Input/Output (LEMO) Analog Front-end mezzanine FPGAs and interfaces Clock tree Test board power supply Test board layout status Test board pending question Analog mezzanine … Schedule LHCb upgrade meeting

  2. Necessity of Test board • If we want to used a A3P family, it is necessary to test many major characteristics of this components • SSO : It is imperative to measure this effect on this new family, because if it problem is important it requires major modification on the design of the board • I/O configurations / bank •  There are a lot of possible standards, but generally a single one per bank • Maximum speed of specific function for data compression • On the CROC board with the ProAsics Plus family we had a lot of timing problem. We must check this part with the A3P family • With this board we will test time adjustment with Delay chip • This test board will do the readout for several analog mezzanines (based on delay line and switch methods) LHCb upgrade meeting

  3. Tests board architecture CROC prototype tests : schedule Schedule for SPECS development Time adjustement and input/output of the board Analog Front-end mezzanine FPGA and Interfaces LHCb upgrade meeting

  4. Time adjustement with delay chip and Input/Output (LEMO) CROC prototype tests : schedule Schedule for SPECS development More information on the clock tree slide ! • 2 Inputs (NIM translator) for each FPGA • 2 Output (NIM translator) for each FPGA • 1 Input Ext_Clk (NIM translator) for A3PE • 1 Output Ext_Clk (NIM translator) for A3PE LHCb upgrade meeting

  5. Analog Front-end mezzanine CROC prototype tests : schedule Schedule for SPECS development • 8 x {ADC_Data Channel (12b)} • 8 x {Clk for ADC_Data Channel (LVDS)} • 2 x Global Clk (LVDS) • 4 Spare for A3PE • 4 Spare for AX500 • I2C • Reset LHCb upgrade meeting

  6. FPGA and Interfaces CROC prototype tests : schedule Schedule for SPECS development FPGA and Interfaces • A3PE1500 • AX500 (socket) • SPECS and USB Interface through A3PE • I2C Interface from A3PE to AX • JTAG download for A3PE • JTAG for AX : Silicon Explorer LHCb upgrade meeting

  7. Tests board power supply CROC prototype tests : schedule Schedule for SPECS development P7V Regulator - 4913 AVCC for Analog Mezza (+3 to +5V) Regulator - 4913 DVDD for Analog Mezza (+2V5 to +3V3) VCC for board (+5V) Regulator - 4913 P3V3 for board (+3,3v) Regulator - 4913 (VccIO bank fixe) P1V5 for FPGA core 1,5v < VccIOB_Var < +2,5v) Regulator - 4913 (VccIO bank variable) P2V5 for bank (+2,5v) Regulator - 4913 (VccIO bank LVDS) M7V Regulator - 7913 AVEE for Analog Mezza (-3 to -5V) Regulator - 7913 VCC for board (-5V) • Lab. Power Supply input (+/- 7V) • 8 Radiation tolerance regulator ! ! LHCb upgrade meeting

  8. Tests board Clock Tree CROC prototype tests : schedule Schedule for SPECS development • Each FPGA receive 2 adjustable Clock (LVDS) • Analog mezzanine receive also 2 adjustable Clock (LVDS) • Each ADC_Channel receive 1 Clock (LVDS) LHCb upgrade meeting

  9. Test board layout status IN / OUT (NIM) Delay Chip USB A3PE1500 Top SPEC Mezzanine AX500 Bottom Analog Mezzanine 120x120mm REGULATOR IN / OUT (NIM) LHCb upgrade meeting

  10. Test board layout status (2) LHCb upgrade meeting

  11. Pending question • Analog mezzanine Request implemented, last chance for modification !! • Size of the board ? • Position of the connectors ? • Pinout modification of the connectors ? (distribution of GND pins) • Others questions ? Analog Mezzanine 98 mm 95 mm LHCb upgrade meeting

  12. Tests board schedule CROC prototype tests : schedule Schedule for SPECS development December January February End of Schematic Holiday CAD Manufacturing Tests LHCb upgrade meeting