120 likes | 276 Views
This document details the current status of the LHCb upgrade test board development. It includes essential test considerations for analog mezzanine interfaces, time adjustments using delay chips, and input/output configurations. Discussion highlights the necessity of testing characteristics of A3P family components, as well as timing issues encountered with the CROC prototype. Additionally, power supply requirements and clock tree architecture are addressed, and a detailed schedule for testing activities is provided for the upcoming months.
E N D
Tests Front-end Status Necessity of Test board Test board architecture Time adjustement with delay chip and Input/Output (LEMO) Analog Front-end mezzanine FPGAs and interfaces Clock tree Test board power supply Test board layout status Test board pending question Analog mezzanine … Schedule LHCb upgrade meeting
Necessity of Test board • If we want to used a A3P family, it is necessary to test many major characteristics of this components • SSO : It is imperative to measure this effect on this new family, because if it problem is important it requires major modification on the design of the board • I/O configurations / bank • There are a lot of possible standards, but generally a single one per bank • Maximum speed of specific function for data compression • On the CROC board with the ProAsics Plus family we had a lot of timing problem. We must check this part with the A3P family • With this board we will test time adjustment with Delay chip • This test board will do the readout for several analog mezzanines (based on delay line and switch methods) LHCb upgrade meeting
Tests board architecture CROC prototype tests : schedule Schedule for SPECS development Time adjustement and input/output of the board Analog Front-end mezzanine FPGA and Interfaces LHCb upgrade meeting
Time adjustement with delay chip and Input/Output (LEMO) CROC prototype tests : schedule Schedule for SPECS development More information on the clock tree slide ! • 2 Inputs (NIM translator) for each FPGA • 2 Output (NIM translator) for each FPGA • 1 Input Ext_Clk (NIM translator) for A3PE • 1 Output Ext_Clk (NIM translator) for A3PE LHCb upgrade meeting
Analog Front-end mezzanine CROC prototype tests : schedule Schedule for SPECS development • 8 x {ADC_Data Channel (12b)} • 8 x {Clk for ADC_Data Channel (LVDS)} • 2 x Global Clk (LVDS) • 4 Spare for A3PE • 4 Spare for AX500 • I2C • Reset LHCb upgrade meeting
FPGA and Interfaces CROC prototype tests : schedule Schedule for SPECS development FPGA and Interfaces • A3PE1500 • AX500 (socket) • SPECS and USB Interface through A3PE • I2C Interface from A3PE to AX • JTAG download for A3PE • JTAG for AX : Silicon Explorer LHCb upgrade meeting
Tests board power supply CROC prototype tests : schedule Schedule for SPECS development P7V Regulator - 4913 AVCC for Analog Mezza (+3 to +5V) Regulator - 4913 DVDD for Analog Mezza (+2V5 to +3V3) VCC for board (+5V) Regulator - 4913 P3V3 for board (+3,3v) Regulator - 4913 (VccIO bank fixe) P1V5 for FPGA core 1,5v < VccIOB_Var < +2,5v) Regulator - 4913 (VccIO bank variable) P2V5 for bank (+2,5v) Regulator - 4913 (VccIO bank LVDS) M7V Regulator - 7913 AVEE for Analog Mezza (-3 to -5V) Regulator - 7913 VCC for board (-5V) • Lab. Power Supply input (+/- 7V) • 8 Radiation tolerance regulator ! ! LHCb upgrade meeting
Tests board Clock Tree CROC prototype tests : schedule Schedule for SPECS development • Each FPGA receive 2 adjustable Clock (LVDS) • Analog mezzanine receive also 2 adjustable Clock (LVDS) • Each ADC_Channel receive 1 Clock (LVDS) LHCb upgrade meeting
Test board layout status IN / OUT (NIM) Delay Chip USB A3PE1500 Top SPEC Mezzanine AX500 Bottom Analog Mezzanine 120x120mm REGULATOR IN / OUT (NIM) LHCb upgrade meeting
Test board layout status (2) LHCb upgrade meeting
Pending question • Analog mezzanine Request implemented, last chance for modification !! • Size of the board ? • Position of the connectors ? • Pinout modification of the connectors ? (distribution of GND pins) • Others questions ? Analog Mezzanine 98 mm 95 mm LHCb upgrade meeting
Tests board schedule CROC prototype tests : schedule Schedule for SPECS development December January February End of Schematic Holiday CAD Manufacturing Tests LHCb upgrade meeting