Browse
Recent Presentations
Recent Stories
Content Topics
Updated Contents
Featured Contents
PowerPoint Templates
Create
Presentation
Article
Survey
Quiz
Lead-form
E-Book
Presentation Creator
Create stunning presentation online in just 3 steps.
Pro
Get powerful tools for managing your contents.
Login
Upload
Content Directory
Content Directory
c
claudia-r-adkiso -> cliente
clic-detector-an -> clic-pakistan-co
CLIC Overview
clic detector and physics status
CLIC Detector Main Solenoid Design & Status Report
CLIC DETECTOR PAC RING SHIELDING CONCEPT
CLIC detector & physics study -- Intro and general news --
CLIC detector & physics study MoC , Snowmass input….
CLIC detector & physics study “news from the ET ”
CLIC Detector R&D @ CERN Status + plans
CLIC Detector studies status + plans
CLIC Detector studies status + plans
CLIC detector study and status of the CDR process
CLIC developments Xband FEL linac introduction Xband@Trieste Xband@PSI Xband@SINAP Xband@Turkey
CLIC DR Beam Transfer Optics
CLIC DR Injection and Extraction Elements M.J. Barnes, CERN TE/ ABT
CLIC DR RF system Baseline and Alternatives
CLIC Drive beam BPM
CLIC Drive Beam critical issues by WG6
CLIC Drive beam RF system including phase and intensity stabilisation systems Erk Jensen, BE-RF
Clic droit, puis « plein écran »
CLIC du 08 avril 2009 Bilan des réalisations 2008
CLIC DU 9 JUIN 2009
CLIC e - and e + sources and ILC/CLIC common studies
CLIC e+ capture studies for the baseline
CLIC e + sources status
Clic en el icono de Internet
Clic Facil
CLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3
CLIC FF MAGNET AND IR LAYOUT
CLIC FF where we stand, where are we going?
CLIC FFD
CLIC FFD
CLIC gaiak Laguntza aurkezpena
CLIC GERONTOLOGIQUE ANGERS
CLIC Handling Engineering
CLIC Higgs talks at ECFA LC 2013
CLIC, HL-LHC and FCC
CLIC, HL-LHC and FCC
CLIC I DIC Amb paraules del conte “Berenada al parc” VOCABULARI 3.3
CLIC I DIC Amb paraules del conte “L’esternut d’en Ral” VOCABULARI 4.1
CLIC I DIC Amb paraules del conte “L’esternut d’en Ral” VOCABULARI 4.5
CLIC I DIC Amb paraules del conte “L’esternut d’en Ral” VOCABULARI 4.6
CLIC I DIC SEQÜÈNCIES DE LECTURA So [ a ] lletra A
CLIC I DIC SEQÜÈNCIES DE LECTURA So [ ɔ ] lletra O So [o] lletra O
CLIC I DIC SEQÜÈNCIES DE LECTURA So [m] lletra M. 3
CLIC I DIC SEQÜÈNCIES DE LECTURA So [m] lletra M: 4
CLIC I DIC SEQÜÈNCIES DE LECTURA So [p]: 1
CLIC I DIC VOCABULARI: espais de la ciutat DISCRIMINACIÓ AUDITIVA: [p] o [f]
CLIC I DIC VOCABULARI: mitjans de transport DISCRIMINACIÓ AUDITIVA: [b] o [m]
<clic> şi sonor
CLIC-ILC BDS & MDI work
CLIC-ILC BDS & MDI work
CLIC / ILC Collaboration Meeting 8 Feb 2008 Civil Engineering and Conventional Facilities
CLIC-ILC Collaboration Update
CLIC-ILC Collaboration Update
CLIC-ILC Collaboration Update
CLIC-ILC collaborations on detectors
CLIC-ILC collaborations on detectors
CLIC-ILC connections on Detectors
CLIC – ILC General Issues WG, Update
CLIC_ILD costing – CERN costing tool: WHO HAS WRITE ACCESS ?
CLIC_ILD vertex detector modules and s tave Layout
CLIC Implementation Studies
Clic INICIAR
CLIC Interest in High Gradient FEL Design
CLIC IP beam-based feedback
CLIC Klystron modulator chargers (1)
CLIC LACROIX communes de Ste-FOY-de-Peyrolières et Cambernard Réunion du Mardi 21 décembre 2010 Mairie de Ste-FOY
CLIC*LHC Based FEL*Nucleus Collider
CLIC/LHC sub-micron ground motion and vibration measurements
CLIC luminosity monitoring/re-tuning using beamstrahlung “?”
CLIC Luminosity Overview R. Corsini
CLIC Machine-Detector Interface (MDI)
CLIC Machine-Detector Interface Working Group (MDI)
CLIC Machine Protection
CLIC Main Beam Generation Complex
CLIC Main Beam Injector Complex review
CLIC main detector solenoid and anti-solenoid impact
CLIC Main Linac Cavity BPM Snapshot of the work in progress
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING
CLIC MAIN LINAC DDS
CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization bench
CLIC main linac RF diagnostics system requirements/characteristics Proposal (4th version)
CLIC Main linac structure and Crab cavity
CLIC_Main Linacs Multi-bunch wake effect in various damping schemes
clic manual
Clic manuel
Clic manuel
Clic manuel
CLIC McBRIDE 8-09-2011 Bilan du Système de Gestion de la Sécurité du Site de Rosporden Présenté par Xavier Aubert et
CLIC-MDI meeting 24th of September 2010 – EDMS 1095662
“CLIC MDI Meeting” on 27/01/2012
CLIC MDI
CLIC MDI STATUS
CLIC meeting 2012-16 workpackages - X-band Technologies -
CLIC Meeting April 9, 2010
CLIC mini survey galleries H. MAINAUD DURAND, H. GERWIG
CLIC Module BPM integration
CLIC Module Instrumentation
CLIC MODULE INTEGRATION ISSUES
CLIC MODULE Preparation for the duty cycles
CLIC MODULE Procedure for the thermal and alignment testing of CLIC duty cycles
CLIC MODULE Progress of thermal tests for CLIC duty cycles
CLIC MODULE TRANSPORT AND INSTALLATION
CLIC Module Working Group
CLIC Module Working Group
CLIC near CERN
CliC (NEG) Climate and Cryosphere
CLIC NI Acquisition and Control Module update
CLIC NI Acquisition and Control Module update
CLIC Organogram
CLIC Overview
Browse slideshows:
a
b
c
d
e
f
g
h
i
j
k
l
m
n
o
p
q
r
s
t
u
v
w
x
y
z
0
1
2
3
4
5
6
7
8
9