100 likes | 201 Views
Explore the preparation phase of thermal tests for CLIC duty cycles, including power and air speed measurements, FEA simulator, failure modes, and transients in nominal operation mode. Follow the tests flowchart to monitor thermal transients under various conditions.
E N D
CLIC MODULE Progress of thermal tests for CLIC duty cycles
Preparation phase Duty cycles 20 oC • Power measurements • Air speed measurements • FEA simulator • Nominal operation mode • Failure modes • Transients
Nominal operation mode Day 3 Day 2 Day 1
Tests flowchart Zero position DB and MB 20/02/14 DBQ#1 every 1 oC Power-up DBQ DB and MB 24/02/14 PETS#1 and AS#5 every 1 oC Unloaded conditions DB and MB AS#5 every 1 oC 25/02/14 Loaded conditions DB and MB
Thermal transients Thermal transients in minutes