1 / 10

Progress of Thermal Tests for CLIC Duty Cycles

Explore the preparation phase of thermal tests for CLIC duty cycles, including power and air speed measurements, FEA simulator, failure modes, and transients in nominal operation mode. Follow the tests flowchart to monitor thermal transients under various conditions.

lilly
Download Presentation

Progress of Thermal Tests for CLIC Duty Cycles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC MODULE Progress of thermal tests for CLIC duty cycles

  2. Preparation phase Duty cycles 20 oC • Power measurements • Air speed measurements • FEA simulator • Nominal operation mode • Failure modes • Transients

  3. Nominal operation mode Day 3 Day 2 Day 1

  4. Tests flowchart Zero position DB and MB 20/02/14 DBQ#1 every 1 oC Power-up DBQ DB and MB 24/02/14 PETS#1 and AS#5 every 1 oC Unloaded conditions DB and MB AS#5 every 1 oC 25/02/14 Loaded conditions DB and MB

  5. Power-up DBQ

  6. Unloaded conditions

  7. Unloaded conditions

  8. Loaded conditions

  9. Loaded conditions

  10. Thermal transients Thermal transients in minutes

More Related