slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to PowerPoint Presentation
Download Presentation
COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to

Loading in 2 Seconds...

play fullscreen
1 / 4

COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to - PowerPoint PPT Presentation


  • 131 Views
  • Uploaded on

COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to develop a proposed structure for the working relationship between NUOPC and COPC . Specifically, the proposed structure shall

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to' - dacia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

COPC Action Item 2009-2.6: The COPC/CSAB shall work with the NUOPC Deputy PM to

develop a proposed structure for the working relationship between NUOPC and COPC.

Specifically, the proposed structure shall

consider relationships between NUOPC groups and the CSAB, including the three Joint Action Groups under the CSAB.

In developing the proposed structure, information flow, roles and responsibility, and command authority shall be clearly delineated.

nuopc copc coordination nuopc pm deputy pm proposal
NUOPC/COPC Coordination NUOPC PM/Deputy PM Proposal
  • The NUOPC Project Manager will
    • regularly participate in COPC meetings and
    • monitor the transition of a global high resolution ensemble forecast system from the current developing prototype at the Tri-Agency operational centers.
  • Recommend that the Deputy Project Manager participate in the WG/CSAB to facilitate tracking of tasks associated with moving the NUOPC components to operations.
  • Recommend that COPC augment the membership of the CCM and OCM JAGs to ensure that necessary expertise is available to implement the recommendations of the Unified Ensemble Operations Committee.
  • The PM will update the ESG at each meeting on the status of implementing their vision of the NUOPC ensemble into operations.
slide3

NUOPC

COPC

NUOPC

COPC

Executive Steering Group

Center Directors

Center Director

Invitees

NUOPC

Invitee

AFWA

CNMOC

NWS

AFWA

FNMOC

NCEP

Strategic – Long Term

Strategic – Near Term

WG/CSAB

WG/CSAB

NUOPC

Invitee

Tactical / Execution

JAG/OCM

JAG/ODAA

JAG/CCM

JAG/OCM

JAG/ODAA

JAG/CCM

NUOPC

Invitee

NUOPC

Invitee

NUOPC

Invitee

Execution

Execution

Execution

nuopc copc coordination notional csab proposal
NUOPC/COPC CoordinationNotional CSAB Proposal
  • The NUOPC ESG will exercise existing organizational lines of authority to accomplish NUOPC strategic goals throughCenter Directors
  • Center Directors will coordinate NUOPC-related tasks through COPC as necessary
  • The NUOPC PM will update the ESG at each meeting on the status of implementing their vision of the NUOPC ensemble into operations
  • Center Directors (or their designees) will regularly participate in NUOPC meetings to report status of NUOPC-related tasks
  • The NUOPC Project Manager will regularly participate in COPC meetings to report status of NUOPC planning
  • The NUOPC Deputy Project Manager and/or NUOPC support staff will regularly participate in the WG/CSAB and CCM, OCM and ODAA JAGs to provide insight into NUOPC planning, be apprised of CSAB and JAG tasks associated with NUOPC plans, and support implementation planning and execution