20 likes | 207 Views
ATIS/TIA Joint CMAS Mobile Device Behavior Std. Project Plan Time Line Proposal. 02’08. 02’08. 04’08. 06’08. 08’08. 10’08. 12’08. 02’09. 04’09. 01’08. 03’08. 05’08. 07’08. 09’08. 11’08. 01’09. 03’09. 2Q’12. March 19, 2008. CMAS Election. 1. Introduction. March 20, 2008.
E N D
ATIS/TIA Joint CMAS Mobile Device Behavior Std.Project Plan Time Line Proposal 02’08 02’08 04’08 06’08 08’08 10’08 12’08 02’09 04’09 01’08 03’08 05’08 07’08 09’08 11’08 01’09 03’09 2Q’12 March 19, 2008 CMAS Election 1. Introduction March 20, 2008 2. Overview March 20, 2008 Document Complete 3. Assumptions April 17, 2008 4. CMAS Notification & Presentation May 20, 2008 4.1 CMAS Alert Tone 4.2 CMAS Vibration Cadence 4.3 CMAS Message Presentation 4.4 Feature Interaction 4.41 Forwarding Alerts 4.4.2 Reception While Mobile Busy June 26, 2008 5. CMAS Configuration Options 5.1 CMAS Alert Opt-Out Options 5.2 CMAS Alert Tone Options 5.3 CMAS Vibration Cadence Options July 24, 2008 Aug. 5, 2008 6. Considerations for Individuals With Special Needs Proposal Based on Adapted Spec. Outline
ATIS/TIA Joint CMAS CMSP C-InterfaceStd.Project Plan Time Line Proposal 02’08 02’08 04’08 06’08 08’08 10’08 12’08 02’09 04’09 01’08 03’08 05’08 07’08 09’08 11’08 01’09 03’09 2Q’12 March 19, 2008 CMAS Election 1. Introduction March 20, 2008 2. Overview March 20, 2008 Document Complete 3. Assumptions April 17, 2008 4. Requirements May 20, 2008 5. Architecture 6. Alert Gateway to CMSP Gateway Protocol 6.1 Message Structure 6.2 Element Definition 6.2.1 CMAC Alert Attributes Segment 6.2.2 CMAC Alert Info Segment June 26, 2008 July 24, 2008 6.2.3 CMAC Area Segment 6.2.4 CMAC Resource Segment 6.2.5 Definition of CMAC_cmas_geocode Element 6.2.6 Definition of CMAC Response Codes 6.3 XML definition 6.4 Transport protocol 7. CMSP Gateway Information Retrieval from Alert Gateway 7.1 Retrieval mechanism 7.2 Transport protocol Aug. 5, 2008 Proposal Based on Adapted Spec. Outline