Venezuela National Railway Project. Venezuela National Railway Project . Controlling Project Costs and Risks Summer 2008 Kugan Panchadsaram Projecto La Torre Incorporated

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Venezuela National Railway Project' - yan


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
venezuela national railway project2
Venezuela National Railway Project

Controlling Project Costs

and Risks

Summer 2008

KuganPanchadsaram

Projecto La Torre Incorporated

RaisaSpector, Omar Mahmoud, David Saavedra, Mark Sanbower, Roberto Mosciovecchio, and Suzanne Smith

project background
Project Background
  • Our company, Projecto La Torre Incorporated, has been contracted bythe ministry of infrastructure of the government of Venezuela to construct 5 miles of railway embankment at a remote location in the state of Guarico(8 hours Southwest of the capital city, Caracas).
  • This project is part of the initiative by the government of Venezuela to expand the national railway system as stated in Venezuela’s constitution of 1999.
project requirements and characteristics
Project Requirements and Characteristics
  • 5 miles of railway embankmentconstructed
  • Recruiting workers for the project
  • Construction of temporary infrastructure (dorms, cafeteria, office, and storage)
  • 9 months to complete the project
  • Financing the project
  • $4,000,000 budget
venezuela
Venezuela
  • RepublicaBolivariana de Venezuela
  • Capital City: Caracas
  • Language: Spanish
  • Area: 353,841 square miles
  • Population: 28,199,822 
  • GDP: $335 billion (30th in the world)
  • Major Export: Oil
  • Popular Sports: Baseball and Soccer
team contract
Team Contract

Our team contract states

how we will work and

communicate with each

other on the project. All

team members helped

write the contract and

all team members

signed the contract.

project scope statement
Scope statement is a

document that defines the

project and lists what must

be accomplished.

It states the boundaries

of the project - what will

done and what won’t be

done on this specific

project.

Project Scope Statement
work breakdown structure wbs and wbs dictionary
Work Breakdown Structure (WBS) and WBS Dictionary
  • The WBS divides major project deliverables into smaller, more manageable components.
  • The WBS was done to level 3.
  • The WBS Dictionary explains all terms, especially potentially confusing terms, to anyone reading the WBS.
  • The following slides contain excerpts from our WBS and WBS Dictionary
risks on the railway project
Risks on the Railway Project

Our project offered us a unique opportunity to learn about a variety of interesting risks. Here are some of the risks we faced:

  • Business in Venezuela involves fraud and corruption.
  • Venezuela has a strong rainy season that may vary in length.
  • Natural disasters, including storms and mud slides, occur frequently.
  • The political, economic, and financial situation is unstable.
  • Crime, particularly robbery and kidnapping, is common.
  • Internet access is not reliable in remote parts of the country.
  • It may be difficult for us to obtain skilled workers.
risk strategy
Risk Strategy

Our risk strategy consisted of the following:

  • Create a preliminary Risk Checklist.
  • Create a Risk Breakdown Structure.
  • Built on the checklist using quantitative risk analysis to create a more developed Risk Checklist with risk causes, probability and impact numbers, and risk scores.
  • Used the probability and impact numbers from the developed Risk Checklist to create a Probability Matrix.
  • Create Risk Ranking based on risk scores for each risk.
risk breakdown structure
Risk Breakdown Structure
  • Similar to a WBS, the RBS provides a visual way of systematically identifying risks in detail.
  • Risks are organized into categories and sub-categories.
  • We used our developed Risk Checklist and the categories we identified to create our RBS.
risk probability matrix
Risk Probability Matrix
  • Using our risk scores, we developed a Risk Probability Matrix.
  • The matrix serves as a visual tool for determining which risks fall into the low, medium, and high risk categories.
  • We decided on the following ranges:
    • Low = < 23
    • Medium = 24-44
    • High = 45 <
the members of team 3
The Members of Team 3

Raisa Spector – PM Roberto Mosciovecchio Mark Sanbower Omar Mahmoud David Saavedra Suzanne Smith