Project Milestone Update: Team Paradigm's Discrete Cosine Transform Design Progress

Team Paradigm has made significant strides in the Discrete Cosine Transform project. Key achievements include completing the design and architecture proposals, alongside gate-level design and component simulations. The project has focused on maintaining speed while reducing size, achieving a chip layout completion of 90%. Notable milestones such as DRC and LVS checks for component layouts are finalized. The revised transistor count stands at 31,484 with a density/porosity of 0.155. The team looks forward to addressing any concluding questions as we progress to the next phase.

vienna
Download Presentation

Project Milestone Update: Team Paradigm's Discrete Cosine Transform Design Progress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. :: Milestone 82-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan M2: Team Paradigm

  2. Team Paradigm M2: Team Paradigm

  3. Design Goals Project Status • Still Speed but also • Reduction of size • Design Proposal (Done) • Architecture Proposal (Done) • Gate level Design(Done) • Component Layout (DRC & LVS): (Done) • Component Simulation: (Done) • Component Layout (Done) • Component Simulation (Done) • Chip Layout (90%) • TBD • Chip Layout (Finished) • Spice Simulation of Entire Chip M2: Team Paradigm 18-525, Integrated Circuits Design Project

  4. Masks for 1-D M2: Team Paradigm

  5. Poly Top M2: Team Paradigm

  6. Poly Bottom M2: Team Paradigm

  7. M1 Top M2: Team Paradigm

  8. M1 Bottom M2: Team Paradigm

  9. M2 Top M2: Team Paradigm

  10. M2 Bottom M2: Team Paradigm

  11. M3 Top M2: Team Paradigm

  12. M3 Bottom M2: Team Paradigm

  13. M4 Top M2: Team Paradigm

  14. M4 Bottom M2: Team Paradigm

  15. 1ddct M2: Team Paradigm

  16. 2DDCT • 450 by 450 • Sorry yesterdays transistor count was only for the DCTs • Revised Transistor Count: 31484 Transistors • Density/Porosity: 0.155 M2: Team Paradigm

  17. ::conclusion & questions M2: Team Paradigm