FLOOD SITUATION MULTAN DIVISION (10 SEP 2014 / WED)

FLOOD SITUATION MULTAN DIVISION (10 SEP 2014 / WED). SEQ. THREAT. Two flood waves of 5 lacs cusecs and 8.5 lacs cusecs are mov in succession in R Chenab A flood wave of 4 lacs cusecs is mov in R Jehlum

ulla-sears
Download Presentation

FLOOD SITUATION MULTAN DIVISION (10 SEP 2014 / WED)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLOOD SITUATIONMULTAN DIVISION(10 SEP 2014 / WED)

  2. SEQ

  3. THREAT • Two flood waves of 5 lacs cusecs and 8.5 lacs cusecs are mov in succession in R Chenab • A flood wave of 4 lacs cusecs is mov in R Jehlum • At Present Confluence of flood wave in R Chenab and R Jehlum, at Trimmu - a magnified threat for Mtn and Mzg

  4. TENTATIVE FLOOD FORECAST TIMMING FOR MTN AND MZG (REF FFD EX PMD) Cumulative eff of all three waves likely to generate a serious threat to Mtn and Mzg – 7 – 8 lac cusecs. Attenuation and dissipation due to Trimmu Breaches is likely to reduce the inflow at Multan / Mzg by 25 %

  5. CRITICAL TIME TEMPLATES • Sensitive time – 1800 hrs 10 Sep to 1800 hrs 13 Sep 14. • Critical time – 0400 hrs 11 Sep to 2200 hrs 13 Sep 14. • Imperatives • Decision by Dist: Admn /breaching committee to activate all breaching sections around Mtn and Mzg vital by LL 9 Sep 2014 • Protection and diversion of breaching sites by Dist: Admn • Safe sites of relief camps • Maint of MSR – NHA and C&W

  6. RESPONSE

  7. FLOOD PROTECTION BUNDS F NORTH - LAYYAH LALA CREEK LAYYAH TOWN BUND MZG FB SHAH WALI BUND DHOLLEWALA BUND 6 NO BUND ESCAPE KAURAHT KOT SULTAN BUND HIGH EDGE OF R INDUS VEHOVAHT ABBASSWALA BUND KOT SULTAN DY RANGPUR CANAL U HAZARA DY FAZAL FB CHENAB FB SANGHARHT NAWABPUR FB MAGASON BR TPLC U/S GHUTTU FB SHUJABAD BR AKBAR FB DOABA FB KASTORI FB MZG CANAL SHER SHAH FB DG KHAN CANAL RAILWAY FB ROHARI FB LINK - 1 SORI LUND HT D/S GHUTTU FB NAGANI FB GUJJUHATTA BR FB VIDOREHT DHUNDA FB K GARH FB KATCHI CANAL MZG BR GARDEZPUR FB SS FB SAKHISARWARHT MZG BR FB JAMPUR FB JALALPUR KHAKI FB TILE BUND RMB MITHWANHT FLOOD EMBANKMENT – LINK III JATOI BR BALOCHWAH FB KAHAHT JATOI BR FB AHMADPUR FB NURPUR DY CHACHARHT LINK - III COLONY FB BUKHARI DY PITOKHT FAKHAR FB FOREST DY KHAN WAH FB FAKHAR MINOR RLY EMBANKMENT CHANADARBHAN FB PANJNAD CANAL SHAKRANI FB SORISHUMALIHT ROJHAN FB MINCHAN FB ROJHAN DY ZANGIHT CHACHARAN FB

  8. BREACHING SITES KAURA HT VEHOVA HT SidhnaiHWs Resp : ARMY SANGHAR HT • Shershah Lt • ShershahRt • HMW • Sidhani HWs HMW Resp : ARMY SHUJABAD BR Sher Shah Lt & Rt Resp : ARMY SORI LUND HT VIDORE HT SAKHI SARWAR HT MITHWAN HT PunjnadHWs Resp : ARMY KAHA HT CHACHAR HT PITOK HT SORI SHUMALI HT ZANGI HT

  9. BREACHING SECTION HEAD MUHAMMAD WALA (HMW)

  10. BREACHING SECTION HMW BR Chenab River Breaching Sec Being evalby NHA for mechbreaching TPLC Khushab Rd NPFB HMW Br Shujabad Canal AFPB • Breaching sec notified by NHAAuths • 65 liners have been placed • Explfor breaching sec has not been purchased so far • SAFEGD AGAINST MULTAN Multan

  11. LAYOUT OF FPBs – BREACHING SECS HMW RT 2 TPLC to be closed. Part of Plan B SUBJECT TO APPROVAL BY Zonal Breaching Committee and civil adm HMW LT 1

  12. LAYOUT OF FPBs – BREACHING SECS SHERSHAH RT 4 3 Doaba FPB SHERSHAH LT 7 CULVERT 1 2 Akbar FPB 8 5 6 Rohari FPB 9

  13. EXEC OF – BREACHING PLAN SHER SHAH SEC SHERSHAH RT 4 3 • Ph 1 (12 Hrs) • Collection of expl • Mov to Mtn • Prep of charges • Ph 2 ( 10 Hrs) • Depl of 3 x army breaching teams • Charging of breaching secs • Depl of Guard • Ph 3 ( 1 x Hr) • Final Breach Committee meeting • Firing of on written orders Doaba FPB SHERSHAH LT 7 1 2 Akbar FPB 8 5 6 Rohari FPB 9

  14. EXEC OF – BREACHING PLAN SHER SHAH SEC SHERSHAH RT 4 3 • Seq of Breaching • 1 and 2 wdr to Mtn • or • 6 and 5 wdr to Mzg • 7 and 8 simultaneously • 3 and 4 wdr to Mzg Doaba FPB SHERSHAH LT 7 1 2 Akbar FPB 8 5 6 Rohari FPB 9

  15. ARRANGEMENTS

  16. LIKELY AFFECTED POPULATION

  17. LIKELY AFFECTED POPULATION

  18. EVACUATION • Rescue-1122 + Police + Army + Revenue Teams employed • Announcement made in Mosques / Media • Imposition of Section 144 of Cr Pc • Forceful Evacuation

  19. RELIEF Establishment of Camps (37) Provision of Food Hampers Setting up of tent villages Medicine/treatment for Flood Affectees Fodder/medicine/vaccination of Livestock Rescue through ARMY, NAVY, 1122, Police

  20. EQUIPMENT / MACHINERY / SUPPLIES MULTAN DISTRICT BOATS 33 DEWATERING SETS 127 SUCKER MACHINES 14 TENTS 5000 FOOD HAMPERS to be purchasedWATER FILTRATION PLANT 01 HELICOPTER 01

  21. EQUIPMENT / MACHINERY / SUPPLIES KHANEWAL DISTRICT BOATS 17 DEWATERING SETS 26 SUCKER MACHINES 5 TENTS 585 FOOD HAMPERS to be purchasedWATER FILTRATION PLANT NIL HELICOPTER NIL

  22. REHABILITATION • Advance Gardawri has been done • Probable Affected Area • Crops Acres • Survey regarding House Holds complete • Post Flood compensation will be based on Advance Girdawri