slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Guam Power Authority Presentation to the Pacific Power Association 14 th Annual Conference & Trade Exhibition Augus PowerPoint Presentation
Download Presentation
Guam Power Authority Presentation to the Pacific Power Association 14 th Annual Conference & Trade Exhibition Augus

Loading in 2 Seconds...

play fullscreen
1 / 20

Guam Power Authority Presentation to the Pacific Power Association 14 th Annual Conference & Trade Exhibition Augus - PowerPoint PPT Presentation


  • 362 Views
  • Uploaded on

Guam Power Authority Presentation to the Pacific Power Association 14 th Annual Conference & Trade Exhibition August 26, 2005. From Independent Power Producers to Performance Management Contracts, Guam Power Authority’s Long Road Towards Reliable Power . Team Members.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Guam Power Authority Presentation to the Pacific Power Association 14 th Annual Conference & Trade Exhibition Augus' - tracey


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Guam Power AuthorityPresentation to thePacific Power Association14th Annual Conference & Trade ExhibitionAugust 26, 2005

From Independent Power Producers to Performance Management Contracts, Guam Power Authority’s Long Road Towards Reliable Power

team members
Team Members

Frank S. Blaz – GPA Manager of Generation

John J. Cruz, Jr., P.E. – GPA Manager, Strategic Planning & Operations Research

Jennifer G. Sablan – GPA Asst. Manager, Generation (Acting)

Arlene M. Aromin, P.E. – Special Projects Engineer, GPA Executive Office

overview
Overview
  • Introduction
  • History
  • Performance Management- Concept
  • Performance Management- Reality
  • Performance Management- The Experience
  • Conclusion
introduction
Introduction
  • Pioneered Public-Private Partnerships on Guam
  • Independent Power Producers
  • Performance Management Contractors
history
History
  • Challenges to address the ongoing emergency and urgent need for adequate and reliable power generation system in Guam
    • Depletion of Personnel Resources
    • Accelerated Load Growth beyond forecasts
    • Increased Forced Outage Rate
    • Load Shedding
  • GENERATION EXPANSION PROJECTS
    • 1993 – Fast Track Diesel (App 93 Mw)
    • 1992 / 1994 – Dededo Combustion Turbine (App 45 Mw)
    • 1995 / 1996 – Cabras 3 & 4 (App 79 Mw)
history privatization phase i
History- Privatization Phase I
  • 1996 - GPA began emergency procurement for Independent Power Producers (IPP) & Performance Management Contractors (PMC)
    • Marianas Energy Company (MEC)
      • Piti 8&9 - 88 MW Slow Speed Diesel (1999)
    • Taiwan Electrical and Mechanical Engineering Services (TEMES)
      • Piti #7 - 40 MW Combustion Turbine (1997)
    • Pruvient Energy Guam Inc.
      • Tanguisson Power Plant - 53 MW Steam (1997)
history privatization phase i7
History- Privatization Phase I
  • IPP Responsibilities:
    • Construction, operation and maintenance
    • Performance Guarantees (Heat Rate & Availability)
  • PMC Responsibilities:
    • Rehabilitation, operation and maintenance
    • Management of GPA Employees
    • Performance Guarantees (Heat Rate, Availability, EFOR)
pmc conceptualization
PMC Conceptualization
  • Continued Improvement of GPA Operations
    • Lockbox Accounts
    • Further Privatization Efforts (PMC)
  • Public Utilities Commission strongly recommended the implementation of permanent PMC
      • Cabras Steam Power Plant
      • Cabras Low Speed Diesels
  • Development of RFP for privatization of management of all GPA Baseload Plants.
pmc reality
PMC - Reality
  • Maintenance
  • Performance

Improvement

Projects

  • Outsourcing
  • Contract Terms
  • Communication
  • and Reporting
  • Financing
  • Budgeting
  • Compensation Structure
  • Staffing
  • Training
  • Operations
pmc reality10
PMC- Reality

Performance Management Contractors

  • 2003 - Taiwan Electrical and Mechanical Engineering Services (TEMES)
    • Cabras 1&2 – 132MW Steam
  • 2005 - Doosan Engine
    • Cabras 3&4 – 88MW Slow Speed Diesel
pmc the experience
PMC – The Experience
  • Equivalent Availability
  • Relative Heat Rate
  • Staff Optimization
  • Operations & Maintenance Spending
  • Personnel Overtime Spending
pmc conclusions
PMC - Conclusions
  • Significant Plant Performance Improvements
    • Staffing Optimization
    • Expedited completion of CIP/PIP (Procurement)
    • Heat Rate, efficiency gains
    • Reliability improvements
    • Skills improvement of O&M Personnel
    • Process efficiency enhancements
    • Economic Dispatching
  • Results:
    • $ Savings to GPA and its ratepayers
thank you
Thank You!