'Cabling' presentation slideshows

Cabling - PowerPoint PPT Presentation


Linac4 construction site 16.05.2012

Linac4 construction site 16.05.2012

Linac4 construction site 16.05.2012. Equipment Hall - 1. Equipment Hall - 2. RF stations with circulators and waveguides. Tunnel from low-energy side. Tunnel – from high-energy side. C abling with waveguides and LLRF cables (right).

By lindley
(97 views)

Chapter 1 Cabling and Safety Overview

Chapter 1 Cabling and Safety Overview

Chapter 1 Cabling and Safety Overview. Chapter Objectives. Learn about the Cabling Industry and the Cabling Job Market Examine Safety Codes and Standards Discuss Safety Around Electricity Discuss Lab and Workplace Safety Practices Learn about Personal Safety Equipment. Analog Telephony.

By jeb
(262 views)

The installation of the n ew VIRGO Injection Bench

The installation of the n ew VIRGO Injection Bench

The installation of the n ew VIRGO Injection Bench. Paolo La Penna for the VIRGO collaboration European Gravitational Observatory. Recombined configuration: first half of 2004. IB. Recycled interferometer: July 2004. IB. PR reflection inside IMC: frequency noise. Black: PR misaligned

By brie
(119 views)

Chapter Overview

Chapter Overview

Chapter Overview . Floppy Disk Drives Hard Disk Drives. The Basics of Floppy Disk Drives . Keeping a Floppy Disk Drive Running. Watch for exposure to environmental conditions and foreign objects. Schedule monthly cleanings. Check the floppy disk first for data errors or write protection.

By agatha
(145 views)

R2E Report

R2E Report

R2E Report. RadWG Meeting, August 20 th 2009. M. Brugger for the R2E Study Group. As a Reminder …. The R2E Mandate. Short-Term. Inventory. Prioritization. Testing. Monitoring. Mid-Term. Coordination. Long-Term.

By kato
(138 views)

Short introduction into the Superconductors Lab for the exchange program between

Short introduction into the Superconductors Lab for the exchange program between

Short introduction into the Superconductors Lab for the exchange program between TE/MSC-SCD and TE/MSC-TF By Gerard Willering 11-05-2010. + About 3 technical students + About 5 doctoral students + 1 fellow + External In total about 28. TE-MSC-SCD Activities.

By stian
(82 views)

Unit 5 Assignment

Unit 5 Assignment

Unit 5 Assignment. Project Changes Charles W. Jansen, II Kaplan University IT499-01 Bachelors Capstone in Information Technology Instructor: Allison Selby June 14, 2012. (Fictitious network consultant) 6838 Old Banyan Way Naples, FL 34109 (239) 273-8604 chuckamania@chuckamania.net.

By viho
(145 views)

High Bandwidth Transverse Feedback Path to Full Function System

High Bandwidth Transverse Feedback Path to Full Function System

High Bandwidth Transverse Feedback Path to Full Function System. Constraints and Assumptions Staged Path Decisions and Deliverables . W. Hofle . Time Line Constraints . LS1 and LS2 Major works in SPS tunnel only in Long Shutdowns

By lise
(126 views)

Control of the PS 10 MHz system after LS1

Control of the PS 10 MHz system after LS1

Control of the PS 10 MHz system after LS1. Performance and reliability issues of the LLRF have triggered several developments around the PS 10 MHz:. Implies some hardware changes on low-level and power sides To be implemented coherently Objectives of today’s meeting:

By feivel
(70 views)

Network+ Guide to Networks 6 th Edition

Network+ Guide to Networks 6 th Edition

Network+ Guide to Networks 6 th Edition. Chapter 5 Topologies and Ethernet Standards. Objectives. Describe the basic and hybrid LAN topologies, and their uses, advantages, and disadvantages Describe the backbone structures that form the foundation for most networks

By montana
(75 views)

Review of the EC-ASIC

Review of the EC-ASIC

Review of the EC-ASIC. S. Ahmad, P. Barrillon , S.Blin , D. Cuisy , S. Dagoret - Campagne , P. Dinaucourt , R. Sliwa , JL. Socha March 1 st 2012 - LAL. Outline. Specifications Asic description Constraints Interface with PDM board Planning Summary. The EC-ASIC board.

By more
(147 views)

PHEOS PSRR

PHEOS PSRR

PHEOS PSRR. PSRR Objectives: Show that all system requirements have been defined and are traceable to top level science objectives. Further, all requirements can either be met with the baseline design (or compliance issues have been identified). . PHEOS PSRR Mission Systems and Requirements.

By kaida
(148 views)

KTAG Mechanics, Optics and Cooling

KTAG Mechanics, Optics and Cooling

KTAG Mechanics, Optics and Cooling. Progress and Schedule. KTAG Schedule for Technical Run. Build stage-1 detector January 2012 to July 2012 Half detector (4 octants) [Incorporate improvements later] 32-channel readout [Final design is 64] Preliminary optics [defer cost and complexity]

By howard
(106 views)

LArTF and MicroBooNE Installation

LArTF and MicroBooNE Installation

LArTF and MicroBooNE Installation. D. Bogert , C. James. Outfitting Concerns for MicroBooNE. Topics - - Cryo safety and access to pit Getting the tank installed and insulated Service crane to the pit Electrical service to detector elements set in place after the vessel is installed

By langer
(129 views)

EN/STI investigations during LS1 in TDC2 and TCC2

EN/STI investigations during LS1 in TDC2 and TCC2

EN/STI investigations during LS1 in TDC2 and TCC2. TDC2: -TCSC (collimator) to be replaced if … TCC2: -Targets Stations T2-T4-T6 *Monitors and Target equipment *Cabling *Flow meters Annual maintenance. To keep in mind for each operation: waste, contamination. TCSC in TDC2.

By apu
(101 views)

Chapter 3: Planning a Network Upgrade

Chapter 3: Planning a Network Upgrade

CCNA Discovery 2. Chapter 3: Planning a Network Upgrade. 3.1: Document the Network Site Survey Physical and Logical Topologies Network Requirements 3.2: Planning Physical Environment Cabling Structured Cabling 3.3: Purchasing and Maintaining Selecting LAN devices

By sal
(433 views)

Ninja Cabling Unconventional Tactics to Unleash the Power of Creo Cabling

Ninja Cabling Unconventional Tactics to Unleash the Power of Creo Cabling

Ninja Cabling Unconventional Tactics to Unleash the Power of Creo Cabling. Brian K. Martin June 6 , 2012. We’re all here today for one reason. …to learn how everyone can use Creo cabling using the knowledge they already have (with just a few new clicks and tricks). Zombies.

By eldon
(532 views)

Fahim Al-Neshawy 10.2.2014

Fahim Al-Neshawy 10.2.2014

Rak-43.3312 Repair Methods of Structures II. Sensors and systems for non-destructive testing of facade structures : Humidity and temperature monitoring. Fahim Al-Neshawy 10.2.2014. OUTLINES. PART I Concrete facade. PART II Heat and moisture transfer. PART III Monitoring systems.

By olisa
(77 views)

BASIC TELECOMMUNICATIONS

BASIC TELECOMMUNICATIONS

BASIC TELECOMMUNICATIONS . PATCH CORDS. Telecom Cabling. Even with the advent and deployment of wireless technology, with its inherent problems of size, speed, and security Most people still feel more comfortable with hard-wired systems . Telecom Cabling. voice-telephone

By durin
(92 views)

Detector Safety System overview

Detector Safety System overview

Detector Safety System overview. DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware ) 2 redundant PLC ~ 700 input signals (sensors) ~ 400 actuators (actions) accommodated in 7 racks underground and on surface . ~ 700 alarms

By nova
(122 views)

View Cabling PowerPoint (PPT) presentations online in SlideServe. SlideServe has a very huge collection of Cabling PowerPoint presentations. You can view or download Cabling presentations for your school assignment or business presentation. Browse for the presentations on every topic that you want.