1 / 7

SOMALIA

SOMALIA. 2002-2004 - IGAD-led Somali peace process End 2004/beg 2005 - Election of Speaker and President and appointment PM & Cabinet Nov 2004 – Stockholm meeting – donors agree to a PCNA May 2005 – Preparatory phase of PCNA begins. The Somali Joint Needs Assessment Clusters.

rusty
Download Presentation

SOMALIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SOMALIA • 2002-2004 - IGAD-led Somali peace process • End 2004/beg 2005 - Election of Speaker and President and appointment PM & Cabinet • Nov 2004 – Stockholm meeting – donors agree to a PCNA • May 2005 – Preparatory phase of PCNA begins

  2. The Somali Joint Needs Assessment Clusters • Governance, Safety & Rule of Law (UN) • Macroeconomic Policy & Data Development (WB) • Productive Sectors & Environment (WB) • Basic Social Services & Protection of Vulnerable Groups (UN) • Infrastructure (WB) • Livelihoods & Solutions for the Displaced (UN)

  3. Cross-Cutting Issues • Peace-building, Reconciliation and Conflict Prevention (UN-WSP) • Capacity Building (WB) • Gender Parity & Human Rights (UN)

  4. WB+UN in Somalia • UN has strong on-the-ground presence • WB has small LICUS program and minimal history or presence over last 15 years • Perception in Somalia that the WB will not re-engage substantially until the debt issues has been resolved • UN+WB have a Joint Secretariat for the JNA • Donors have so far expressed preference to fund the UN • National versus regional partners

  5. Challenges of working with the WB • Recruitment of JNA experts – WB – output driven, UN process driven – leading to:- • Substantially higher cost on the side of the UN. UN has 40 experts, WB has 20. • Broken momentum & inconsistent presence as WB teams are on more limited contracts than the UN • Field Driven? – applicable to both UN & WB • Slow funding and contractual modalities

  6. Challenges of working with the UN • Consistent presence = ongoing assessment • Having to key into the UN framework – UNDSS, UN flights • WB Output driven versus UN process driven • Turf wars on some sub-clusters such as local governance

  7. Future role – UN&WB in Somalia • Discussion on ways forward for MDTF between the WB & UN not yet taken place • UN positioned for quick impact, highly visible implementation post donor conference • ISFS, SEBSP • Donor preference throughout the JNA for funding the UN

More Related