“Power/Bloc for Circuit Breaker Lockout/Tagout”. Applications and Product Review Overview – Measurement - Installation 2008. Power/Bloc. PERMANENT - Permanently mounted in panels, load centers, free-standing breakers ( with 3M DP805 adhesive – no penetrating fasteners)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - ros


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Power bloc for circuit breaker lockout tagout l.jpg

“Power/Bloc for Circuit Breaker Lockout/Tagout”

Applications and Product Review

Overview – Measurement - Installation 2008


Power bloc l.jpg
Power/Bloc

  • PERMANENT - Permanently mounted in panels, load centers, free-standing breakers (with 3M DP805 adhesive – no penetrating fasteners)

  • UNIVERSAL - Fits any manufacturer – domestic, foreign, custom-fabricated - of any age

  • SIMPLE - Materials retained at the point of use (except lock and/or tags)

  • Patent #6,266,231

  • Made in the USA


Power bloc3 l.jpg
Power/Bloc

  • Allows lockout of each individual breaker with no restriction of access to other breakers

  • Will lock out any length

  • Fits any panel up to 600 volts and main breakers up to 1600 amps

  • Use with standard ¼″ shank diameter lock

  • Use with group multi-lock hasp

  • Use with small three tumbler lock and closed door adapter for closed door operation


Power bloc4 l.jpg
Power/Bloc

Meets or exceeds:

  • OSHA Standard 29 CFR 1910.147

  • OSHA Standard 29 CFR 1910.269

  • NFPA 70E

  • ANSI Z244.1

  • MSHA Standard 30 CFR 56.12016

  • MSHA Standard 30 CFR 56.12017

  • MSHA Standard 30 CFR 57.12016

  • MSHA Standard 30 CFR 57.12017

  • CSA Z460


Power bloc kits l.jpg
Power/Bloc Kits

  • Color-coded, T-slotted anodized aluminum channel

  • Color-coded, non-conductive, adjustable polymer bars (T or Hook design)

  • Non-metallic holder(s) for T and Hook bars to retain materials at point of use

  • Label


Power bloc design l.jpg
Power/Bloc Design

Lock fits in slotted channel above T or Hook Bar providing lockout until removal

5-inch T Bar

3 ½-inch Hook Bar

(bars are trimmed to fit for breaker throw and panel center measurement)



High profile panels l.jpg
High Profile Panels ¾″ or greater)



Low profile panels l.jpg
Low Profile Panels less than 9/16″)


Power bloc ordering options l.jpg
Power/Bloc Ordering Options less than 9/16″)

  • May be ordered as stock kit (21″ length) to be field cut by facility staff

  • May be provided as pre-cut kits, labeled for specific panels/locations, based upon measurements from site survey


Measurement review of panels l.jpg
Measurement/review of Panels less than 9/16″)

  • Option to schedule facility survey by Safety Design representative resulting in site-specific quote and custom labeled and fabricated kits (at no additional charge)

  • Facility staff may survey and submit to Safety Design representative for site-specific quote


Ordering protocol l.jpg
Ordering Protocol less than 9/16″)

  • Orders accepted as Purchase Order, VISA, MasterCard, or American Express

  • Terms: Net 30

  • Shipping: UPS Ground (unless specified otherwise), Prepay and Add, FOB Factory

  • Estimated Shipping Schedule: 2-3 weeks ARO, contact representative for current lead times


Panel measurement and review l.jpg
Panel Measurement and Review less than 9/16″)





Power bloc measurement observations l.jpg

Does the panel have a ridge down the center? Wide or narrow ridge?

Does the panel have a V-shaped valley down the center?

Is there a metal holder attached to the door that would encroach into the panel depth?

Note: Power/Bloc is provided as a High Profile model for panels with a depth of ¾″ or more or a Low Profile model for panels with a depth of 9/16″ or less. *This measurement is critical.

Power/Bloc Measurement/Observations


Power bloc measurement observations19 l.jpg
Power/Bloc ridge?Measurement/Observations

  • Does the level of the breakers sit above the panel dead front or does the breaker design have a rim that would require a shim to allow the Power/Bloc channel to mount level with the breaker? How high is the elevation?

  • Are the breakers recessed below the panel dead front? How deep is the depression?

  • Does the panel have a Main Breaker?



Power bloc installation l.jpg
Power/Bloc Installation ridge?

  • Installation with 3M DP-805 two-part acrylic adhesive

  • Installation materials include dual adhesive tube assembly, installation gun (or conversion kit to allow use with a standard caulking gun), and mixing tubes




Power bloc kit notes l.jpg
Power/Bloc Kit Notes ridge?

  • If a facility survey has been conducted and a site-specific proposal prepared, you will receive custom fabricated kits as ordered

  • Each kit will be labeled with the appropriate panel (or location) designation and contain all materials for that panel or load center


Panel preparation l.jpg
Panel Preparation ridge?

  • Use of DP-805 adhesive allows installation without removal of panel cover

  • Scuff panel to bare metal for optimum bonding and wipe area clean

  • Use of solvents is not normally required but wiping with isopropyl alcohol or commercial de-greaser is recommended



Slide27 l.jpg

Dispense small amount of adhesive until two part adhesive feeds evenly prior to adding mixing tube; attach mixing tube to adhesive firmly and twist for secure fit




Power bloc installation30 l.jpg
Power/Bloc Installation channel

Align mid-point of first two slots in Power/Bloc channel with mid-point of top breaker; center Power/Bloc channel in panel


Slide31 l.jpg

Place Power/Bloc channel in panel and hold until set in place –2-3 minutes working time – full cure in 24 hours (follow placement instructions supplied with kit)

Quick release painters tape or masking tape may be used to hold channel in place until adhesive is set.

If there is more than one Power/Bloc channel to accommodate the length of a panel, attach the longest part on top and place the additional piece adjacent to the first piece.


Slide32 l.jpg

Release pressure, discard mixing tube and recap adhesive at end of installation or during significant time delay in installation process. Adhesive setting up in mixing tube may be delayed by wrapping in a damp cloth and placing on ice pack during multiple kit installation process. Replace mixing tube when adhesive begins to harden in tube.


Dual power bloc channels for wide center panel 3 l.jpg
Dual Power/Bloc Channels for Wide Center Panel (> 3″) end of installation or during significant time delay in installation process. Adhesive setting up in mixing tube may be delayed by wrapping in a damp cloth and placing on ice pack during multiple kit installation process. Replace mixing tube when adhesive begins to harden in tube.


Place 1 8 bead of adhesive on bar holders l.jpg
Place 1/8″ bead of adhesive on bar holders end of installation or during significant time delay in installation process. Adhesive setting up in mixing tube may be delayed by wrapping in a damp cloth and placing on ice pack during multiple kit installation process. Replace mixing tube when adhesive begins to harden in tube.


Mount bar holder s in panel l.jpg
Mount bar holder(s) in panel end of installation or during significant time delay in installation process. Adhesive setting up in mixing tube may be delayed by wrapping in a damp cloth and placing on ice pack during multiple kit installation process. Replace mixing tube when adhesive begins to harden in tube.

Placement may be horizontal or vertical


Trim stop loc bars to fit specific panel and breaker throw l.jpg
Trim Stop/Loc bars to fit specific panel and breaker throw end of installation or during significant time delay in installation process. Adhesive setting up in mixing tube may be delayed by wrapping in a damp cloth and placing on ice pack during multiple kit installation process. Replace mixing tube when adhesive begins to harden in tube.

Before trimming – T-bars are 5″ long Hook bars are 3½″ long


Slide37 l.jpg
Place Stop/Loc bars in panel to provide materials at point of use. Place identification label on panel, if desired


Small main where applicable l.jpg
Small Main (where applicable) of use. Place identification label on panel, if desired

Attach small strip in proper location for Stop/Loc bar to push against small main


Power bloc with individual lock l.jpg
Power/Bloc with Individual Lock of use. Place identification label on panel, if desired


Power bloc with multi lock hasp l.jpg
Power/Bloc with Multi-Lock Hasp of use. Place identification label on panel, if desired


Closed door bar for use with tag or small lock l.jpg
Closed Door Bar for Use With Tag or Small Lock of use. Place identification label on panel, if desired


Power bloc with small lock for closed door operation l.jpg
Power/Bloc with Small Lock for Closed Door Operation of use. Place identification label on panel, if desired


Power bloc lockout tagout procedure notes l.jpg
Power/Bloc Lockout/Tagout Procedure Notes of use. Place identification label on panel, if desired

  • All appropriate electrical testing procedures must be followed.

  • The procedure detailed in this tutorial is designed to refer only to the portion of the lockout or tagout process that includes manipulation of the components of the Power/Bloc system and is not designed to be used as a comprehensive internal procedure.


Power bloc procedure for lockout l.jpg
Power/Bloc Procedure for Lockout of use. Place identification label on panel, if desired

  • De-energize selected breaker

  • Remove Stop/Loc bar from holder (hook bar or T-bar), place in slotted channel and adjust to restrain movement of breaker. Place individual lock, multi-lock hasp with locks, or closed door bar with small three tumbler lock in space above Stop/Loc bar. Make sure all locks and tags are attached securely.


Power bloc procedure for tagout l.jpg
Power/Bloc Procedure for Tagout of use. Place identification label on panel, if desired

  • Power/Bloc is designed as a system for tagout that provides the added protection of a restraint device with the simplicity and accessibility of a tagout procedure, where allowed.

  • The standard Power/Bloc kit is mounted in the panel according to installation instructions.

  • Remove Stop/Loc bar from holder (hook bar or T-bar), place in slotted channel and adjust to restrain movement of breaker. Place closed door bar in space above Stop/Loc bar. Attach tag to closed door bar according to site procedure.


Power bloc procedure for tagout46 l.jpg
Power/Bloc Procedure for Tagout of use. Place identification label on panel, if desired

  • A Stop/Loc bar is used with a closed door bar and tag assembly as specified by owner’s procedure to prevent the selected circuit from being re-energized until the tag, closed door bar, and Stop/Loc bar are removed.

    * Note: Materials will be in place to allow future conversion to a full lockout procedure, if desired.


Tag for id of critical circuits l.jpg
Tag for ID of Critical Circuits of use. Place identification label on panel, if desired

  • Some facilities choose to use Power/Bloc with a closed door bar and tag for ID and assistance in prevention of accidental disconnection of a few critical circuits.

  • NOTE: Energized circuits should NEVER be locked on.


Lmhp for large breakers l.jpg
LMHP for Large Breakers of use. Place identification label on panel, if desired

Standard bar length is 8″ Available in other lengths upon request. Shims may be required.


Lmhp for large breakers49 l.jpg
LMHP for Large Breakers of use. Place identification label on panel, if desired


Wide center panels l.jpg
Wide Center Panels of use. Place identification label on panel, if desired

Panels with center width

over 3″ requiring

(2) Power/Bloc channels


Individual molded case breaker l.jpg
Individual Molded Case Breaker of use. Place identification label on panel, if desired

Power/Bloc may be attached directly to molded case circuit breaker with 3M DP-805 adhesive


Multiple circuit lockout l.jpg
Multiple Circuit Lockout of use. Place identification label on panel, if desired

Multiple circuits may be locked out with minimal locks, if desired. Contact factory for details.


Other applications l.jpg
Other Applications of use. Place identification label on panel, if desired

DIN Rail

Mounting

bracket

to raise

Power/Bloc

channel to

level of

breaker may

be required


Other applications54 l.jpg
Other Applications of use. Place identification label on panel, if desired

Rotary Operator


Other applications55 l.jpg
Other Applications of use. Place identification label on panel, if desired

  • You are invited to present other electrical lockout challenges for review; we are frequently able to assist with solutions.

  • Digital pictures are helpful for review.


Training materials l.jpg
Training Materials of use. Place identification label on panel, if desired

Power/Bloc training board is supplied (at no charge) to our clients to use in their training program.

This training board may be used with this tutorial.


Power bloc by safety design inc l.jpg
Power/Bloc by Safety Design, Inc. of use. Place identification label on panel, if desired

  • Consult website at www.powerbloc.com for measurement survey forms.

  • Contact Betty Wayman, Strategic Accounts Manager, Safety Design, Inc. with questions or comments.

  • E-mail: waymanbw@powerbloc.com

  • Mobile: 615-310-9793

  • TEL: 615-292-8744

  • FAX: 615-297-0842