1 / 7

ToolKitX Lockout Tagout Software

details about software

rohit388
Download Presentation

ToolKitX Lockout Tagout Software

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TOOLKITX LOCKOUT TAGOUT SOFTWARE TRACK ACTIVITY TO IMPROVE WORK SAFETY HTTPS://TOOLKITX.COM/

  2. 4) KEY OUTCOMES (BENEFITS) A modern LOTO system does far more than record locks. It unifies program elements—asset energy sources, procedures, approvals, training credentials, and audit trails—into a single source of truth. Technicians get mobile guidance; managers get proof of compliance and real- time status. Ensure the right equipment is isolated in the right order Generate real-time proof of compliance (e.g., OSHA 29 CFR 1910.147 alignment) Keep technicians, contractors, and visitors aligned with instant mobile updates Recover lost productivity—no more control-room treks for missing permits https://toolkitx.com/campaign/loto/

  3. FEATURE HIGHLIGHTS LOTO Dashboard One-Click LOTO Approval Full History & Tamper-Proof Logs Smart Distribution Lists Config Hub Physical + Digital LOTO https://toolkitx.com/campaign/loto/ Real-Time Alerts

  4. 7-STEP LOTO PROCEDURE Notify everyone Identify all energy sources (electrical, hydraulic, pneumatic, mechanical, thermal, gravity, etc.) Shut down equipment safely De-energize isolation devices (open disconnects, close valves, engage blocks) Apply locks and tags; record serials in the system Release or bleed stored energy (pressure, capacitors, moving parts) Verify isolation Centralized Control attempt normal start; sign off in the software https://toolkitx.com/campaign/loto/

  5. IMPLEMENTATION FLOW Preparation: Gather asset lists, photos, and past permits; build digital templates Notification: System emails/texts staff and contractors. Isolation: Workers follow on-screen steps for each energy source. Verification: Supervisor confirms isolation and approves work. Work: Maintenance proceeds under controlled, logged conditions. Release: Remove locks in reverse order with digital sign- off. https://toolkitx.com/campaign/loto/ Inspection: Auto-generate post-job checklist and store within the app. Custom Workflows

  6. CONTINUOUS IMPROVEMENT (OSHA COMPLAINT MANAGEMENT) Within the same interface, workers can report potential LOTO issues or near misses. Cases route to EHS for root-cause analysis and corrective actions—closing feedback loops and reinforcing safety culture. https://toolkitx.com/campaign/loto/

  7. BOOK A LIVE DEMO https://toolkitx.com/campaign/loto/ CONTACT INFORMATION: +49 6131 9213566 PRESS@TOOKLITX.COM Wilhelm‑Theodor‑Roemheld ‑Str. 14. 55130 Mainz, Germany https://toolkitx.com/

More Related