70 likes | 147 Views
Review of past incidents, current operational status, and future plans for RHIC and related experiments. Reports on machine performance, system updates, and safety measures. Schedule discussions for upcoming activities.
E N D
Time Meeting: Agenda • Safety • Schedule: Past, Present and Future • RHIC and Experiments Reports • Machine and Systems Reports • AOB
Safety • Take 5 for Safety…………..Ed Lessard
Schedule: Past • Found corrector y8-tv15 had wrong polarity • Created new ramp dAu82 to solve slow factor problems • Made things worse, had to retreat to dAu80 again… • Vacuum Problems in AGS • Followup to understand cause of vacuum leak • Followup on LOTO • Followup on RF trip • Access on Monday • Blue abort kicker smoke detector problems • Swapped out b07-tq6 • Iris Scan work for PHENIX • Trigger work for STAR
Schedule: Future • Access issues. Require a job number in order to get a key? • Makes last minute accesses harder to do. • Makes failures a little less likely.. • Ramp up and scrubbing until 1 Dec. • Physics declared 1 Dec.
RHIC and Experiments Reports • RHIC………………………….…….Kip Gardner • STAR......................................Bill Christie • PHENIX.................................Mike Leitch • Polarimeter…………………….Haixin Huang • MonoPole….............Vasily Dzhordzhadze • BLIP…………………….…..Leonard Mausner • Operations…………………………Fulvia Pilat
Machine Reports • Operations………….…...Peter Ingrassia • Sources...............................Jim Alessi • Booster and AGS...............Leif Ahrens • Maintenance………….…Paul Sampson • Beam Lines…………………..Al Pendzick • Instrumentation……...……..Tom Russo
Systems Reports • Vacuum..........................Mike Mapes • Power………………………Jon Sandberg • RF................................Alex Zaltsman • Controls...........................John Morris • Access Controls……….Jonathan Reich • RCF………………………...Michael Ernst