An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Elesa SA-Coopelectric “Elevación de terna en 33 kv, para reponer altura reglamentaria:”

  2. Producción 24 horas L-L

  3. Vano muy bajo

  4. Retención lado opuesto

  5. Se puede hacer con tensión? Ahora empieza lo que no se ve Planeando la tarea Problema: Vano Bajo

  6. 30 Cm 94 Cm 1,60 m 2,80 m

  7. Colocando la cruceta de hierro, ayudado por la cruceta lateral

  8. Aisladores de apoyo con vaina guía para puentes

  9. Sosteniendo la cadena, para conectar la fase central

  10. Controlando la altura, fase central después del traslado

  11. Equipo de intercomunicación para día ventoso

  12. Elesa SA, agradece a Gustavo Corso-Coopelectric Roberto Ayala-EDVSA Mariano Manno-ELESA SA Sebastián Arata-ELESA SA Carlos Arata-ELESA SA Por haber colaborado para poder realizar este trabajo

  13. Elesa SA, agradece a A las autoridades del CACIER por la oportunidad de exponerlo A los presentes por su tiempo y atención Muchas gracias!!!!!