In this presentation, the Schematic Design phase of the project is highlighted. The committee's role is to approve the building footprint layout and ensure compliance with the Campus Master Plan. Details include site selection, site plan, tree removal approvals, building design considerations, and sustainability practices.

perailes
Download Presentation

Schematic Design Committee Meeting Presentation for Project Manager

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DATE OF LUFPC COMMITTEE MEETING SCHEMATIC DESIGN PROJECT MANAGER PROJECT MANAGER

  2. • DO NOT INCLUDE FLOORPLANS DO NOT INCLUDE FLOORPLANS • Use this template as a guide to build your presentation. Not all slides may be applicable to your project, and additional slides may still be needed. • Read the suggestions in the ‘Notes’ section to help develop the content for each slide. • During the Schematic Design phase of Major Projects, the committee is approving the general building footprint layout layout, as well as reviewing for compliance compliance with the Campus Master Plan Campus Master Plan. building footprint and site site • Throughout the template, refer the resources below to assist with answering questions: Campus Master Plan About the Land Use & Facilities Planning Committee • • Campus Design Guidelines Landscape Master Plan • • Historic District & Archaeology Tree Mitigation Policy • • 2 2

  3. • Example: The project is located at the southeast corner of Gale Lemerand Drive and Stadium Road • Example: The scope of this project is to build a 10,000SF building Use this space to provide an Aerial Map showing the projects location. • Example: The purpose of the project is.. • Example: This site was selected because.. 3 3

  4. • Example: Attended the Lakes, Vegetation & Landscaping Meeting on MM/DD/YY and on MM/DD/YY • At the ASD phase, the committee discussed the proposed site plan and tree removals • Committee made a motion to approve presented approve the project as 4 4

  5. • Example: The placement for the building on the project site was determined by.. • Example: The site layout is cohesive with surrounding areas because.. Use this space to provide the site plan • Example: Stormwater will be addressed by.. 5 5

  6. • Example: At their meeting on MM/DD/YY, the Lakes, Vegetation & Landscaping Committee approved the removal of.. Use this space to provide images of the trees and their locations on the project site. • Example: No trees proposed for removal are heritage trees *Note: This may require more than one slide 6 6

  7. • Example: The building will be three stories tall and will relate to neighboring buildings by.. Use this space to provide a rendering or examples of materials • Example: The PHB&S committee was concerned that the character defining arched entryway would be impacted by the rehabilitation project, and the design team modified the design ensure it would be preserved.* 7 7

  8. • Provide more details about the building design, if needed. Use this space to provide additional building renderings 8 8

  9. • Example: The project will be pursuing LEED Gold • Example: The project will be incorporating LID practices such as.. Use this space to provide a photo, rendering, or other applicable graphic 9 9

  10. Example: A motion to approve the project as presented. PROJECT NUMBER & NAME PROJECT NUMBER & NAME 10 10