Item 4.1 Progress on Reporting and WISE

Meeting of Water Directors 30 Nov/1 Dec 2006. Item 4.1 Progress on Reporting and WISE. Contents. Progress and next steps on compliance – 2010 reporting on WISE (incl 2008 tools) on GIS new mandate. WG D Organisation. WISE Steering Group *. WISE Technical Group. *Internal EU

Download Presentation

Item 4.1 Progress on Reporting and WISE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting of Water Directors 30 Nov/1 Dec 2006 Item 4.1 Progress on Reporting and WISE

  2. Contents • Progress and next steps • on compliance – 2010 reporting • on WISE (incl 2008 tools) • on GIS • new mandate

  3. WG D Organisation WISE Steering Group* WISE Technical Group *Internal EU coordination only Preparation/Coordination level Working Group D Reporting Supporting expert networks or drafting teams Compliance State-of-the- environment (SoE) GIS/IT

  4. WG D – progress - compliance • Preparation of 2010 RBMP reporting guidance well underway • Article 3 and 5 assessments (nearly) completed • Feedback on Art 3 started – validation process by consultant nearly completed • Article 8 electronic submission tools developed and tested (see WISE)

  5. 2010 reporting guidance – overall time planning Part A 2004 guidance 2005 reporting sheets Part B.1 2005 reporting sheets (2010 data definitions) Part B.2 2007 reporting sheets Part C 2010 reporting sheets (RBMP+PoM) Part D 2010 reporting sheets (objectives and results) Part E • July – Dec 2006: • Oct 06 – March 2007: • April – June 2007: • Presentation of complete draft guidance to Water Directors in June 2007

  6. 2010 RBMP reporting – key issues • Informal status of WISE reporting process • Conceptual discussions on “compliance approach” and “programme of measures” illustration • Aggregated or disaggregated “status maps” (similar to Article 5 reporting) • Link between compliance and SoE data needs

  7. Article 3 Re-submission • 9 Member States – data re-submitted, all OK, ready to be uploaded to database • 4 Member States – data re-submitted, some work required to “tweak” data • 3 Member States – correct contact obtained to be progressed by end of today • 9 Member States – have been contacted by e-mail, no response, contact details being validated • Aim to have all contacts made by end of November

  8. Article 5 Submissions • 11 Member States have submitted all components required • 10 Member States have submitted some components • 4 Member States (and Norway) have submitted nothing • Upload of submitted data to database is almost complete

  9. WISE – progress • WISE guidelines under preparation • Electronic submission foreseen for Art 8 reporting • IT tools for Art 8 currently being tested – available in Jan 2007 • WISE workshop in 9/10 Jan 2007 • WISE technical group operational • Preparation of new WISE GIS guidance complementing 2002 document

  10. Data definition/ requirements Step 1: Compliance or SoE, voluntary (or through comitology) IT tools development Step 2: End-user tool, schema/DEM, XML/shape/GML, other tools (DD, glossary), Submission Step 3: Submission process by data holders, help desk Development Database Step 4: central holding area (CDR), management of access rights Acceptance Step 5: Standardised manual or automatic tests, feedback to data submitters Production Databases(WISE nodes) Step 6: Final data storage Viewing, GIS visualisation Analysis Step 7b: Tools for compliance or SoE assessment, CCM2 Step 7a: Public or restricted viewing, map service, aggregation, statistics, GIS reference dataset

  11. WISE – next steps • Submission well completed and reviewed • Establishment of WISE Technical Group led by EEA • Work on WISE Implementation Plan has started • Art. 8 data submission only through WISE – development of rules and procedures document needed • WISE public portal under development – several components

  12. P1.1 P2.1 P1.2 P1.0 P2.2 P2.4 P2.3 water.europa.eu Welcome [Eurokeys] Projects How to use…[RTD/JRC] Input services EEA Data How to use…[EEA] Policy [ENV] Services Overview [Eurokeys] Themes [EEA] P1.1.3 P1.1.5 P1.1.8 P1.1.2 P1.1.4 P1.1.1 P1.1.6 P1.1.7 P1.1.10 P1.1.9 Sitemap FAQ What to find… Contact News Maps Message Board Index/search Links Disclaimer Concept for WISE web portal (Status: 22/11/2006) Are you looking for information on WATER - …? Thematic web pages Thematic web pages WISE GIS Portal WISERTD Portal Extra- Services [EEA] EEA web page LIFE web page ESTAT web page RTD/JRC web page Water Data Centre

  13. Next steps • Validation of Art 3 and Art 5 data in WISE until Jan 2007 • New electronic submission system for Art 8 reporting ready for submission in Jan 2007 – presentation on workshop • 2010 Reporting Guidance – final draft presented to SCG in May 2007 • WISE TG stating to work on GIS guidance – interaction with GIS experts • SoE group to finalise work on task 3 ...

  14. Discussion • Water Directors are invited: • Take note and discuss the progress on all activities • Discuss and agree the interim mandate (see later agenda item)