MODAPS PIP Report. July 28, 2009. 1-877-711-1856 759461. Summary of MODAPS Production 7/28. Forward Processing C5, 5.1 and 4.1: Aqua forward processing is as close to real time as possible; Terra is 2 days behind due to a delay in delivery of ancillary data from the data provider;

malini
Download Presentation

MODAPS PIP Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODAPS PIP Report July 28, 2009 1-877-711-1856 759461

  2. Summary of MODAPS Production 7/28 • Forward Processing C5, 5.1 and 4.1: • Aqua forward processing is as close to real time as possible; Terra is 2 days behind due to a delay in delivery of ancillary data from the data provider; • We are reprocessing PGE41 (MCD12Q1), C5 Land Cover Quarterly processing for years 2002-2007 • Year 2002 has completed • We have processed PGE87 (MCD12Q2), C5 Land Cover CMGs through year 2006 • We have started production of PGE42 (MCD12C1), Quarterly 56km CMG Land Cover • Collection 5.1 Burned Area Reprocessing • The leading edge for this reprocessing is at day 2003/155.

  3. Summary of PGE Deliveries to SDST (7/28) Collection 5 • Atmospheres: • A new version of PGE69 was delivered and baselined to correct the bug found in the last science test. • A pre-delivery of the Terra Deep Blue PGEs was received on July 22. • Land: • A new version of PGE11(LSR) for Mandriva was delivered. • Collection 6 • Level 1: • A C6 Terra and Aqua PGE01 has been baselined. • A Terra and Aqua L1B for collection 6 has been baselined. • We are expecting a new delivery with science code updates by the end of this month. • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)

  4. Summary of Science Testing (7/28) • Atmospheres: • A scienece test for one day of Terra and 1 day of Aqua completed successfully using the new version of PGE 69. This version was also run in parallel with forward processing for 29 data days without error. • Land Science Testing: • A science test for PGE72 (for land water mask) is running. Nine of 12 16-day periods have completed. This test is expected to complete August 4. • We have completed generating a 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points and is under review. • Mandriva Science Testing: • PGEs 01, 02, 03, 07, 08, 43 and 44 have passed Mandriva testing. • A chain test from L0 through the land dailies has completed and is under review. A second test is planned for next week. • Land PGEs are being tested using inputs generated on the Mandrake system • PGE 33 is being reviewed by the developer • PGEs 3,7,8,11,12,13,14,15,22,43,44,46,75,80 and 84 were tested. • A second science test for PGE16 completed and failed. • Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed. • Work is continuing on the atmospheres PGEs. • A science test is planned for PGE06