This document provides detailed progress updates on various sections of the project, discussing status, responsibilities, and necessary improvements. The proposed agenda for the Director's review is also included.
E N D
Reminder: Structure and Assignments • Introduction (Prebys) • Elements • Work Breakdown Structure (Sims) • Subproject • 1.1 Linac (Allen) • 1.2 Booster (Prebys) • 1.3 Main Injector (Kourbanis) • 1.5 Proton Study Group (Prebys) • Cost and Schedule (Sims) • Proton Projections (Prebys)
My Sections (delegating where noted) • Introduction • Status: Pretty good. Needs some language cleaned up • Booster Element: • 1.2.1 Rep. Rate and Reliability • Status: Still waiting on final numbers about 15 Hz operation from John Reid and Bob Ducar • 1.2.2 ORUMP • Status: Project complete. Writeup pretty good. Needs data on performance • 1.2.3 Corrector System • Responsible: Craig Drennan • Status: Not bad, but needs updating • 1.2.4 30 Hz • Needs descoping language • 1.2.5 Gamma-t • Status: Needs to be updated with simulation and experimental data • 1.2.7 Cavity cooling • Needs closeout language, as well as possible performance data (high rate tests?)
My Sections (cont’d) • Booster (Cont’d) • 1.2.9 RF Cavities • IF it’s in the plan, John Reid will be primarily responsible • Writeup needs lots of work • 1.2.11 Booster Dump Relocation • Responsible: Bill Pellico • Writeup fairly complete • Needs closeout description and some performance data • 1.2.12 Booster Chopper • Still quite vague what this will entail • Might morph into something different. • 1.2.13 RF Improvements • Very vague what this includes. • Is it even still there?