1 / 19

What else? Alternatives to DFG Lynn Collingbourne

What else? Alternatives to DFG Lynn Collingbourne. The funding problem. DFG allocation increased by 5.9% in 2011/12 £20 million extra funding from DH January 2012 BUT..... Reduction in renewal funding from £1.07 billion in 2008/9 to £300 million in 2010/11 and zero from 2011/12

joyce
Download Presentation

What else? Alternatives to DFG Lynn Collingbourne

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What else? Alternatives to DFG Lynn Collingbourne

  2. The funding problem • DFG allocation increased by 5.9% in 2011/12 • £20 million extra funding from DH January 2012 BUT..... • Reduction in renewal funding from £1.07 billion in 2008/9 to £300 million in 2010/11 and zero from 2011/12 • Supporting People funding reducing year on year with no allowance for inflation • Handyperson funding reduced from £20 million in 2010/11 to £13.5 million in 2012/13 (£10.50 million for 2014/15) • RPs increasingly using DFG

  3. Changing needs? • Changing aspirations of the baby boomers • Living longer, healthier lives • Desire to continue living in own homes, not institutional settings • People over 65 control 80% UK wealth • Require choice and control and a quick solution once decision made ... need to mainstream accessibility!

  4. The right help at the right time:Centres for Independent LivingDorset and Bristol

  5. Dorset -The ‘structure’

  6. An impression of how the entrance can be modified to create the front of the house. Behind the door will be a kitchen, bedroom, and lounge area. The door can provide a range of experiential learning opportunities.

  7. The main corridor, there is an opportunity to create a street scene here where information can be displayed through shop windows, and a interactive walkway created to provide experiential training in using aids and adaptations for mobility

  8. Outside, there is a garden area which as well as being aesthetically pleasing lends itself ideally for Gardening aids and adaptations, how to enjoy the countryside, active outdoor living etc. Note the perimeter is a mix of decking and paving and can be adjusted to create a mobility, wheelchair training and assessment area

  9. The move-on option

  10. Barriers to moving • Emotional ties with existing home • Potential loss of local support network • Seen as a major disruption • Difficulty in identifying suitable home • Complex application process and CBL systems • Difficulty in going to view homes and envisage how they will ‘work’ • Stress!

  11. Tenant scrutiny feedback • Better information needed • Photos and floor plans helpful • Use of icons for accessibility features • Extend void target for accessible homes • Use of ‘home coming soon’ feature • Also looked at incentives and support

  12. Bristol project • 2010/11 – adaptation costs over £10k – only 2 of 41 rehoused. Savings for the two movers £48k! • Rehousing OT appointed Jan 2012 – aim to rehouse at least 10 households requiring expensive adaptations each year • Menu of discretionary incentives available plus practical help provided by OT/OTA and WEC&R • Better joint working between Adaptations/ HCB/Under-occupancy project/Landlord Services/Development teams • 20 households moved to date!

  13. Launch of new range Includu Designed to make life easier for everyone

  14. THCP – www.thcp.org Lynn Collingbournelynn.collingbourne@thcp.org 07825 828668

More Related