An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Remote-Controlled Balancing Robot Raymond Engle Stanley Hanke

  2. Overview • We will be developing a remote-controlled, self-balancing robot • Wireless communications will be managed by the eBox • Motor controls will be managed by the mbed with an H-bridge

  3. Design Strategy Desktop computer will run a GUI program to connect to the eBox wirelessly eBox will pass operator commands to the mbed via RS-232 serial

  4. Controls Linear shaft encoder and gyroscope is used to provide feedback to the mbed Mbed microcontroller will use state-space integral control to determine corrective course of action

  5. Communications • Commands received by the eBox are forwarded to the mbed for execution GUI interface running on a PC sends data packets containing commands over wifi to the eBox

  6. Materials • Mbed microcontroller • eBox x86 embedded PC • Sparkfun breakout boards: • RS-232 Serial • Gyroscope • H-bridge • 2x Phidgets DC motors • Lead-Acid Battery • Chassis • Wireless Router • Duct tape

  7. Expected Challenges Due to complexities of timing with the state-space controller, we are unsure whether the mbed has sufficient real-time requirements Because of our unfamiliarity with networking in Windows CE, we are concerned that we will have difficulty establishing communications between the desktop and the eBox

  8. Gantt Chart