1 / 6

2004 ITRS Factory Integration

2004 ITRS Factory Integration. Europe Arieh Greenberg, Infineon Asia (Japan, Taiwan and Korea) Michio Honma, NECEL; Shige Kobayashi, Junji Iwasaki, Akihira Chikamura, Renesas; Hiromi Yajima, Toshiba; Mikio Otani, Asyst Shinko; Makoto Yamamoto, Murata; Hiroyki Akimori, Hitachi;

ellema
Download Presentation

2004 ITRS Factory Integration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2004 ITRS Factory Integration Europe Arieh Greenberg, Infineon Asia (Japan, Taiwan and Korea) Michio Honma, NECEL; Shige Kobayashi, Junji Iwasaki, Akihira Chikamura, Renesas; Hiromi Yajima, Toshiba; Mikio Otani, Asyst Shinko; Makoto Yamamoto, Murata; Hiroyki Akimori, Hitachi; Thomas Chen, TSMC; Tom Yeh, PSC; Ivan Chou, HP; US Mani Janakiram, Jeff Pettinato, Intel; Brad Van Eck, Sematech; Eric Englhardt, Maureen Breiling, AMAT; FTF Meeting@ Tokyo, Japan Nov 30th & Dec 1st 2004

  2. ITRS FI FTF Summary • Very good participation • Team closed on 2004 FI efforts and started planning for 2005 FI efforts • Kicked off focus area efforts • Airborne Molecular Contamination (AMC) cross-functional team formed with YE to address Facility and Equipment requirements for <45nm. • 450mm FI team formed to focus on technology needs based IRC ready date of 2012. • “Proactive Visualization” team formed to address high mix, small lot sizes and other key areas. • Good cross-TWG interaction and identified key issues • AMC • Data traceability • more investigation needed for: • 1mm Edge Exclusion (YE conducting survey) • Facility challenges for bulk delivery, vibration, etc.

  3. “Top 9” FI Focus Areas (Not prioritized)

  4. Cross-Cut TWG Discussion (Nov 30th/Dec 1st)

  5. Cross-Cut TWG Discussion (Nov 30th/Dec 1st)

  6. Cross-Cut TWG Discussion (Nov 30th/Dec 1st)

More Related