Site Construction & Installation Services. Overview Work breakdown Structure capacity overview Summary of completed project. Services overview. Site Construction & Installation Services.
E N D
Site Construction & Installation Services • Overview • Work breakdown Structure • capacity overview • Summary of completed project
Services overview Site Construction & Installation Services • Our Civil Works group specializes in the design, construction and installation of radio base station sites. Our construction and installation services include : • Earth work and site work • Site construction included foundation and fence work • Tower and antenna support structure installation and rigging • Lighting protection and grounding system • GSM & MW antenna installation i/c testing, commissioning • Power supply and connection • Work in progress control • “As-built” drawings • Cabin / cabinet / indoor equipment installation • Follow-up until final acceptance • We have also developed the expertise to : • Deploy temporary radio base station sites • Swap-out radio base stations from different infrastructure vendors in a live network environment
Work breakdown structure Site Construction & Installation Services
Capacity Site Construction & Installation Services • Our capacity is to run 12 sites in parallel and we may 1.5 time our sources to reach upto maximum 18 sites parallel.
STC 45 sites with etisal, Edwa shehab and ACES ITC 4 Sites Mobily - Construction 57 sites with etisal, interkey & ACES. Completed site Site Construction & Installation Services