arav
Uploaded by
16 SLIDES
342 VIEWS
160LIKES

Work Breakdown Structure

DESCRIPTION

Work Breakdown Structure. Work Breakdown Structure Early compilation of significant work items w/ associated cost and schedule considerations Overview of project First look at drawings Familiarize self with drawings F 4-7, F 4-5. Work Breakdown Structure.

1 / 16

Download Presentation

Work Breakdown Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Breakdown Structure • Work Breakdown Structure • Early compilation of significant work items w/ associated cost and schedule considerations • Overview of project • First look at drawings • Familiarize self with drawings • F 4-7, F 4-5

  2. Work Breakdown Structure • Need to know what work will be in-house and what will be subbed • Usual GC work: • Hand excavation and backfill • Concrete formwork • Concrete reinforcement placement • Concrete placement • Concrete slab finishing • Structural steel erection • Rough carpentry • Finish carpentry • Siding • Window placement

  3. Work Breakdown Structure • Criteria for deciding if GC does work • Labor – use subs if the trades needed are not employed by GC • Specialization – Sub may be faster/cheaper if that is what they do • Quality – problems with quality become subs problem not GC’s • Price – Sub can do work fixed price for lessthan GC • Work load – If labor tied up another jobs – give to subs • Schedule – GC can control schedule better with own workers

  4. Subs • Use Sub call sheet to get interested subs • Give general details about project • Make sure subs do their own estimate • F 4-6

  5. Quantity Take offs • Measure and count each item of work that GC will perform • Time consuming • What get counted? • 20% of work accounts for 80% of cost • Don’t count nails • Start at bottom and work up

  6. Quantity Take offs • Forces Estimator to think like builder – makes scheduling easier • Quantities recorded and then extended out • F 4-8

  7. Good Estimating habits • Clear paper trail is important • Neat and professional • Others will review and must follow logic • Mark up drawing with colored pencils and highlighters indicating what items have been taken off • Minimizes errors • Quantities should be measured, extended and summarized as they will be purchased • Waste factors for all quantities should be included • F 4-10

  8. Once quantities are taken off • Group all like products together • Transfer to pricing pages • Only one line per product • F 4-9 • F 4-10

  9. Pricing self Preformed Work • Productivity • Labor productivity • Man hours per unit of work • Productivity probably does not change by location – wage rate does • Determine man hours and round up to next hour - not exact science • F 4-11

  10. Wage Rates • Davis Bacon for prevailing wage rates • F 4-12 • Labor burden • 30 – 60% of wage • Cover worker’s comp, union benefits, unemployment, FICA, med ins • Depend on location, craft, accident history • Material prices come directly from suppliers • Written quote if possible but can use estoppel • F 4-13

  11. Pricing Subbed Work • Do quick estimate as a check on sub bids • Subs should be close to what you estimate • If too low or high don’t take • Always use subs price • Analyze F 4-14

  12. Pricing Job Site General Conditions • Job site admin costs • 5 – 10 % of project bid • Need to know how long project is scheduled for • How many labor hours • Project duration vs size

  13. Pricing Co Overhead Indirect Costs • Accounting, marketing, officer salaries, home office supplies • 2 – 5% of project • Depends on how many projects and total $ value • Profit – 7% of project cost

  14. Estimate Summary • F 4-16 • Remove estimates and replace with sub prices • Material tax – sales tax • Contingency • Insurance • - liability insurance is volume related – depends on safety record 0.5 – 2% • Business tax • Bonds

  15. Homework • Ch 4 review questions 1,6,8,9,12,14, • Exercise 1

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer