julian-best
Uploaded by
10 SLIDES
291 VIEWS
100LIKES

Work Breakdown Structure (WBS)

DESCRIPTION

Work Breakdown Structure (WBS). Work Breakdown Structure. A method to organize the project total scope of work in a hierarchical structure where each level represents an increased detail of the level above it. The items at the lowest level in a WBS are referred to as Work Packages

1 / 10

Download Presentation

Work Breakdown Structure (WBS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Breakdown Structure (WBS)

  2. Work Breakdown Structure • A method to organize the project total scope of work in a hierarchical structure where each level represents an increased detail of the level above it. • The items at the lowest level in a WBS are referred to as Work Packages • Work packages may be further decomposed into work activities. • The WBS is used to help in project planning and control as well as to develop a common understanding of the scope of the project.

  3. Work Breakdown Structure

  4. Criteria for WBS ‡ The major components should indicate the deliverables of the project ‡ Lower level components should be measurable to allow scheduling, budgeting, and evaluating progress ‡ Breakdown must allow assignment of responsibility for work items

  5. How to build a WBS • Begin with the Plan, focusing on Objectives and Deliverables • Break the main product(s) down into sub-products • Set the structure to match how you’ll manage the project • Lowest level not too detailed, not too large • Identify support activities • Check for completeness - is all the effort included? • Develop a coding structure if needed • Assign work package managers

  6. Gantt chart • A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule. • Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project.

  7. Gantt Chart / Bar Chart

  8. Gantt chart Gantt chart can provide following optional information too, • Planned vs. actual view of the project • % completion of activities • Overall project progress/ status • Activities on critical path

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer