Status of Readout Boards
Download
1 / 4

Status of Readout Boards and Gas Monitor - PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on

Status of Readout Boards and Gas Monitor. Craig Woody BNL. HBD Working Group Meeting August 1, 2006. Status of Readout Boards. 10 LHS and 10 RHS boards are nearly complete. Should have remaining 6 LHS and 6 RHS from stuffing house at BNL today Procedure

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Status of Readout Boards and Gas Monitor' - price-mclaughlin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Status of Readout Boards

and Gas Monitor

Craig Woody

BNL

HBD Working Group Meeting

August 1, 2006


Status of readout boards
Status of Readout Boards

  • 10 LHS and 10 RHS boards are nearly complete. Should have

    remaining 6 LHS and 6 RHS from stuffing house at BNL today

  • Procedure

    • Receive boards at BNL. Check power planes and mount through hole

    • components (~ 30 min/board)

    • Check that all channels with test pulse are within acceptable output range

    • Have found a few bad channels doing this, which are repaired before gluing

    • Glue on Rohacell backing (4 boards/day)

    • Do final testing after gluing. Pulse each channel and record each preamp

    • output and noise level in data base(~ 1 hour/board)

  • Cross talk

    • There is no evidence for any cross talk when pulsing only one group at a time. There are some small effects of cross talk (~2-5%) when pulsingall channels simultaneously (partly due to test box)

C.Woody, HBD Working Group Meeting, 8/1/06


Status
Status

  • 5/16 (LHS), 4/16 (RHS)

  • completely glued and tested,

  • ready for installation

  • 4/16 (LHS), 5/16 (RHS)

  • glued and ready for final testing

  • 1/16 (LHS), 1/16 (RHS)

  • had problems after mounting final

  • components (shorted power plane,

  • no power to few preamps), but have

  • now been fixed

  • 6/16 (LHS), 6/16 (RHS)

  • due to arrive BNL today

Will take two boards (one LHS and one RHS) to Stony Brook today for test installation on HBD East. Will try new thermal wire stripping tool.

Will begin installation on HBD West next week.

C.Woody, HBD Working Group Meeting, 8/1/06


Gas transmission monitor
Gas Transmission Monitor

  • New Mini-turbo arrived

  • Holes drilled in table for

  • vacuum connections

  • (required to be done in

  • BNLCentral Shops)

  • Essentially all components

  • now in hand

  • Working on Labview program

  • to control spectrometer grating,

  • translational mirror and current switch

  • Should be ready in a few weeks

Mini turbo will be mounted underneath table

C.Woody, HBD Working Group Meeting, 8/1/06