monsoon ir acquisition aladdin front end
Download
Skip this Video
Download Presentation
MONSOON IR Acquisition Aladdin Front End

Loading in 2 Seconds...

play fullscreen
1 / 10

MONSOON IR Acquisition Aladdin Front End - PowerPoint PPT Presentation


  • 68 Views
  • Uploaded on

2.500 V REF. 4.7 uF. MONSOON IR Acquisition Aladdin Front End. Aladdin Front End Test Results. 1 k W external load, BW = 7 MHz No filtering/bypassing of OFFSET ADC input adjusted with OFFSET to low level Histogram means are normalized to 50 ADU Ave. mean = 7,498 ADU

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MONSOON IR Acquisition Aladdin Front End' - murray


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
aladdin front end test results
Aladdin Front End Test Results
  • 1 kW external load, BW = 7 MHz
  • No filtering/bypassing of OFFSET
  • ADC input adjusted with OFFSET to low level
  • Histogram means are normalized to 50 ADU
  • Ave. mean = 7,498 ADU
  • Ave. s.d. = 2.37 ADU

Counts

Channel #

ADU

aladdin front end test results1
Aladdin Front End Test Results
  • 1 kW external load, BW = 7 MHz
  • No filtering/bypassing of OFFSET
  • ADC input adjusted with OFFSET to high level
  • Histogram mean is normalized to 50
  • Ave. mean = 59,566 ADU
  • Ave. s.d. = 2.36 ADU
  • Histograms less smooth at high input level
aladdin to orion front end changes
Aladdin To Orion Front End Changes
  • 100 kW internal load resistor increased to 10 MW
  • Bipolar input AD8021 op amp replaced with FET input OPA627
  • Large 2.2 mF bypass capacitor placed on incoming OFFSET
  • Gain reduced from 3.0 to 2.5
  • BW reduced from 7 MHz to 3 MHz.
orion front end test results
Orion Front End Test Results
  • 1 kW external load, BW = 6 MHz
  • OFFSET bypassed with 2.2 mF.
  • ADC input adjusted with OFFSET to low level
  • Histogram mean is normalized to 50
  • Ave. mean = 7,501 ADU
  • Ave. s.d. = 1.68 ADU

Counts

Channel #

ADU

orion front end test results1
Orion Front End Test Results
  • 1 kW external load , BW = 3 MHz
  • OFFSET bypassed with 2.2 mF.
  • ADC input adjusted with OFFSET to high level
  • Histogram mean is normalized to 50
  • Ave. mean = 57,810 ADU
  • Ave. s.d. = 1.72 ADU
  • Smoother at high level input than Aladdin
monsoon ir acquisition current tests
MONSOON IR AcquisitionCurrent Tests
  • ADC input voltage vs. Offset code
  • Histograms of 1 kW input load to ground for low/high level offset.
  • Histograms of D.C. input for low/high levels
  • Histograms of dynamic step input on even/odd channels
  • Sinewave input to get frequency spectrum
  • Sinewave input to get DNL, and maximum INL
orion test system
Orion Test System
  • 1 IR Acquisition mother and daughter board in test.
  • 1 IR Acquisition mother and daughter board nearly complete pending test results of first board.
  • 1 Clock and Bias board 80 % done.
  • Chassis and CPCI backplane integrated.
  • Power supplies on hand.
monsoon ir acquisition conclusions concerns
MONSOON IR Acquisition Conclusions/Concerns
  • About 1.7 ADU noise performance with Orion design for static 1kW source.
  • Orion design BW = 3 MHz greater than necessary for Orion’s 1.5 msec pixel time @ 10 fps.
  • Histograms become jagged at higher input levels.
  • Unable to fit recommended Vref capacitor (47 mF) for AD7671 on board.
ad