1 / 23

ICEE Demonstration Project

ICEE Demonstration Project. By Dr. W F Fok / Prof K P Cheung Date: Dec 7, 2009 (Mon) Time: 12:30pm Venue: 2/F Yam Pak Bldg. Agenda. Layout of the demo room Projects to be demonstrated Renovation works involved System diagram Work schedule Discussion.

lexine
Download Presentation

ICEE Demonstration Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICEE Demonstration Project By Dr. W F Fok / Prof K P Cheung Date: Dec 7, 2009 (Mon) Time: 12:30pm Venue: 2/F Yam Pak Bldg

  2. Agenda • Layout of the demo room • Projects to be demonstrated • Renovation works involved • System diagram • Work schedule • Discussion

  3. Existing layout of the Yam Pak Bldg 2/F Proposed demo room area

  4. Proposed layout of the demo room Project 3 Project 4 Zone B Video show Project 5 A door should be opened between zone B and zone C Project 2 Project 7 Project 6 Project 1 Project 11 Zone A Project 8 Zone C Project 13 Project 12 Zone D Project 9 Project 10 Project 14 Visitor path Streamlined artistic partition

  5. Zoning

  6. Project (Indoor demo) * For energy collection: poster display and web monitoring in the demo room, real installation at the roof

  7. At the roof N Micro wind turbine S Green house Battery and Equipment room at the roof Facing Chow Yei Ching Bldg

  8. PV panels

  9. PV panels The existing solar facilities will be removed except that the supporting frame can be reused. New PV panels will be installed. 10 pcs of 500W PV panels can be hosted in the existing frame. Capacity: 5kW

  10. Covering the building service facilities

  11. Covering the building service facilities Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance plastic grass carpet

  12. Covering the building service facilities

  13. Covering the building service facilities Existing building facilities will be covered by plastic grass carpet for appearance improvement and easy maintenance

  14. Existing solar facilities to be removed Anther solar facilities including the frame should be removed to provide space for the green house

  15. Existing solar facilities to be removed

  16. Greenhouse for GE agrobiotech demo

  17. Micro wind turbine

  18. Before

  19. After

  20. Battery and Equipment room at the roof Micro wind turbine Solar Panel Battery and Equipment Room Battery and Equipment Room

  21. System diagram At roof In battery room at roof Smart Charger In battery room at roof DC/AC To be shared with world via Internet CCTV Quad Mux Internet Real-time monitoring the status at the roof Powering up LED and demo equipment Charger Status Sensors System ICEE Demo Web portal Wind speed, temperature, humidity, light intensity…etc. In demo room on 2/F

  22. Project Schedule

  23. Other discussions • The pamphlet for each project [ref. Wallace’s pamphlet- when? • Web cam and internet display of demo items? • Summer students to help, budget?

More Related