MOM Report

MOM Report. Galina Vankova. MICE Video Conference. RAL, 1. 09. 2011. MICE Hall current activities 16.08 - 31.08, 2011. Installation of Step IV and Preparation of the fall MICE run Decay solenoid and cryogenic system

yorick
Download Presentation

MOM Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MOM Report Galina Vankova MICE Video Conference RAL, 1. 09. 2011

  2. MICE Hall current activities 16.08 - 31.08, 2011 • Installation of Step IV and Preparation of the fall MICE run • Decay solenoid and cryogenic system - PSU - DL Group to replace selected components; order of pumping rigs - in progress ; Focus is on quench detector replacement • Liquid Hydrogen system - Heater/chiller pipe work making good progress - Building of vacuum system - mezzanine supports and gate valve/cross installation, various PPS activities - in progress • Vacuum installation on roof - vacuum control panel has been installed and roof handrails have been completed • Gas bottle rack outside the MICE Hall - has almost completed

  3. Electrical Infrastructure - cable over main door is installed, earth testing in Hall has to be performed • Target & upstream beam line - T1 removed - Phase II controller installed - Re-build scheduled for 12. 09. , re-installation on 14. 09 - three bobbins has been ordered and cooper for cooling jacket has been provided; T2.8 upgraded, tested and installed Tracker integration in Lab 7 has been completed - efficient operational condition • Detector preparations - EMR - removed to offline position, awaiting electronics removal and shipment to UNIGE - Report of LK/TOF/EMR survey received from DLS • Both BPMs have been removed - The missing spanner (wrench) for the mechanical beamstop frame has been replaced • Online Reconstruction tests - DAQ system modified to run without the EMR , miceraid2 problem needs to be solved - experts involved ,DAQ - ready - as soon as possible