This report outlines essential commissioning needs and operational challenges faced by the MICE project at the University of California, Riverside, as of March 23, 2009. Key issues include the readiness of the decay solenoid for MLI installation, the current malfunction of the quench detector, and the necessity for updated documentation and safety instructions. Additionally, considerations for expert involvement over the Easter weekend, hardware requirements, and infrastructural organization within the MICE Local Control Room are discussed, addressing the tight resource constraints due to UK budget cuts.
Critical Commissioning Needs for MICE Operations at UC Riverside
E N D
Presentation Transcript
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 23, 2009
Commissioning Needs • Working Decay Solenoid – Stands.. • Ready for MLI installation • Repair/testing under intense time crunch - ?? Easter ?? • What are the risks involved in having non-experts babysit the cooldown over Easter weekend? • Worth bringing in PSI expert(s) • Walter Glor or other? • Quench Detector currently not working – need this operational in order to define DS as “working” • “working” means operating at 870 A for at least 24 hours without quench • Working target – Stands.. • one in R78 for demo • one in ISIS for data Commissioning Needs-Coney
Issues • Documentation inventory/overhaul • Instructions for shifters – things are in flux, old documentation needs updating • Safety – need all relevant documents in one obvious place • Detectors – • Need to investigate/design luminosity monitor • Who will build it? • Get Decay Solenoid magnet-on lights working • reposition light on top of turret; check light in ISIS vault • Computing • Still cannot print on OKI printer in R76 • Need Windows PC in MLCR • Need connection to GRID from MLCR Commissioning Needs-Coney
Issues • MICE Local Control Room • Is it required to sign in/out if in MLCR only? Sign-out not obvious – reposition? • Crowded and messy • more shelves on wall • Network connection cables & monitors are under control • Beautification/PR – should be obvious that there is an important experiment happening in Hall/MLCR • posters coming regarding who we are and what we are doing • UK Budget crunch having severe impact on available personnel Commissioning Needs-Coney