An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Open AMI Network 10/22/08

  2. Standards Overview AMI-SEC Utility Systems Meter-Specific Networks Data Collection Systems HAN Wide Area Networks MDM System Network Operations 61968-3 OMS 61968-3 Data Collection 61968-9 MDM Or MDUS 61968-9 Open HAN 1.0 GIS 61968-4 Planning & Scheduling 61968-5 Control & Configuration 61968-9 MDM 61968-9 AMI Network ??? WMS 61968-6 Load Mgmt. 61968-9 Load Control 61968-9 MDUS 61968-9 Meter Data & Comm. C12.19 C12.22 CIS 61968-8 Meter Maintenance 61968-9 AMI-SEC

  3. Consumers Energy’s Service Territory • 1.8 Million Electric Meters • 1.6 Million Gas Meters • 1 Million gas meters in non Consumers Energy’s service territory

  4. AMI – Observations • Differences between systems • Proprietary Communication Technology • System logging and auditing • Device registration – device dependant • Collector • Meter • Substation metering • Other (smart grid devices, etc) • Network management interfaces • Outage reporting • Troubleshooting • Monitoring performance • System configuration and upgrades

  5. AMI – Observations (Cont.) • AMI communication vendors are not interoperable for maintenance and management • Meter • Collector/Access Point/Mesh Gate/Take out point/Cell Relay/Tower Gateway Base Station/ Base Station • HAN ESP interface managed and implemented different between vendors

  6. AMI-Network TF Proposal • Define the devices and well defined points of interoperability within the AMI network for maintenance • Define the benefits of interoperability between AMI network maintenance components to utilities • Sharing backhauls • Gas AMR meters • Water AMR meters • Hybrid AMI systems • Point to Point and mesh and PLC

  7. Proposed TF Scope • Evaluate existing Maintenance Use Cases • Define New Maintenance Use Cases • Define System Functional Requirements for AMI meters to the AMI head end for maintenance/lifecycle purposes • Identify areas within an AMI network that are viable for maintenance interoperability • Scope is outside of OpenHAN and the Zigbee/Homeplug efforts • Input from the Group???

  8. Evaluate Existing Use Cases • SCE use cases • S1 AMI system recovers after power outage, communications or equipment failure • U1 Utility installs, provisions and configures AMI system • U2 Utility manages end-to-end life-cycle of the meter system • U3 Utility upgrades AMI system to address future requirements • Other Utility use cases • AMI Vendor use cases

  9. Define New Use Cases • Focus on maintenance life cycle related activities for the meter thru the head end system • Avoid HAN use cases with the exception of the AMI Communication interface with the ESP • IP/3rd party gateways

  10. Functional Requirements • Create a SRS (system requirements specification) similar to OpenHAN’s efforts • Derive requirements from the use case review • Focus on the AMI head end to the meter from a network maintenance perspective • Input from the group???

  11. Schedule • Meet via teleconference every 3 weeks • Meet at every UCA face to face meeting Questions/Comments? Next Steps?