Ayas and Capitanata – Stage 1

NRM P01. Ayas and Capitanata – Stage 1. Andrea Castelletti. Politecnico di Milano. 2. Conceptualisation. 3. A lternative design. 4. Estimation of the effects. 5. Evaluation of the alternatives. 6. Comparison and negotiation. Mitigation, compensation, new alternatives. no.

tuari
Download Presentation

Ayas and Capitanata – Stage 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRM P01 Ayas and Capitanata – Stage 1 Andrea Castelletti Politecnico di Milano

  2. 2. Conceptualisation 3. Alternative design 4. Estimation ofthe effects 5. Evaluation of the alternatives 6. Comparison and negotiation Mitigation, compensation, new alternatives no compromise alternatives Acceptable consensus? yes Final (political) decision Stakeholders 1. Reconnaissance • Understanding the system • Identifying stakeholders • System definition in time and space • Institutional and legal analysis • Setting up the Objectives • …

  3. S Vasé Cortòz S.Jacques Ru Cortòz(a S.Vincént) Evancon Ayas In the upper part of Val d’Ayas (Italy) the hydropower company has recently proposed the construction of a new run-of-river power plant which should exploit the water from three rivers as in the figure. A water work feeding the town of S.Vincent is located on the the Cortoz river near Cortoz. Goal: to asses the impact of the project, to set up the negotiations with the township of S.Vincent and to evaluate the opportunity of creating a reservoir in S.

  4. Vasé S Cortòz S.Jacques Ru Cortòz(a S.Vincént) Evancon Ayas Pian di Veraz

  5. B A sea . . . . . . . . . . C Capitanata • In the figure is a simplified scheme of the Capitanata water system (Italy) composed of the water reservoir (A) and the relevant distribution network. • Goal: To assess whether the construction of a new reservoir in B (to be sized) is a valuable solution to reduce floods on the river between B and C. Note that: • the river ends (floods) in a wetland area particularly important for the environment conservation, especially as an area of resting for migration birds; • a canal can be built to connect the river to the distribution network.

  6. Capitanata B A sea . . . . . . . . . . C