High Level Post Processing Cost Estimates
High Level Post Processing Cost Estimates. MWG SSC Meeting September 26, 2011. Post Processing Cost Estimates. Futures 4 and 8 increased EE/DR/DG Future 7 Nuclear Uprate Costs F2B, F3B, F5B, F5S7, F6B, and F6S5 integration costs Variable Energy Resource (VER) beyond 25% penetration
257 views • 12 slides