1 / 24

swisstopo Report for EGVAP 2008/2009

swisstopo Report for EGVAP 2008/2009. E. Brockmann. Content. Routine GNSS operation: Status report: Processing, availability Comparison with radio sondes Study of the influence of snow

tracy
Download Presentation

swisstopo Report for EGVAP 2008/2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. swisstopo Report for EGVAP 2008/2009 E. Brockmann

  2. Content • Routine GNSS operation: • Status report: Processing, availability • Comparison with radio sondes • Study of the influence of snow • Tomography approach (project MeteoSwiss, ETH Zurich with ZTD data + double-difference data from swisstopo; results prepared by D. Perler, ETH Zurich)

  3. Processing remarks • Bernese Software 5.0 (+) – close cooperation with University of Berne • Same strategy since November 2006 (GPS week 1400) • Number of sites (and satellites) slightly increased – not yet analyzed 6 super stations included Nov. 12, 2008 ~90 sites ~90 sites32 + 15 sat.

  4. GNSS processing • Since Nov. 06: GPS+GLONASS combined processing • Mid 2007: Permanent network in Switzerland enhanced (GPS-GLONASS combined receivers installed) • Since Oct. 07: ambiguity resolution for hourly processing • [March 2008: absolute antenna model, 3 degrees elevation cut-off, gradient estimation, GNSS as input for tomography] • Today (Nov. 09): 32 GPS and 15 GLONASS satellites – March, 2009 the magic number of 51 GNSS was reached

  5. Processing remarks (2) • rms of unit weight estimated for the GPS phase observables: higher during summer times – evtl. Meteo more difficult to model (?)

  6. EUMETNET – EUREF – MOU: swisstopo use • signed in London, June 2007: Data exchange and usage of radiosonde and synop (meteo) for geodetic scientific use • Routinely 13 collocations with radio sonde data analyzed at swisstopo GNSS site RS site

  7. GNSS validation: PAYE Reference: PP, GNSS, absolute antenna PCV Relative antenna model causes bias RRT solution with bigger variations (small network) GLONASS influence is small for daily PP amb-fix solutions

  8. Validation using different processing options and external sources Radio sonde comparison of 13 sites: ~ positve bias last weeks

  9. Validation with radio sonde data: PAYE • reference: GNSS postprocessing • Absolute antenna phase center related since Mid 2007Trimble Cephyr antenna • Seasonal variations clearly visible

  10. Radio sonde – GPS: PAYE (D. Perler) • Relative antenna phase center till March 2008 • Antenna change (GPS -> GLONASS): June 2007Trimble Microcentered TRM33429.20+GP -> Cephyr antenna TRM55971.00 ( ) • Jump + seasonal variations + day/night differences substracted

  11. Radio sonde – GPS: PAYE (D. Perler) • Results from 2 years: 0:00, 12:00 UTC measurements • Mean ZTD with seasonal variations substracted • At noon: ZTD of radio sonde is 6 mm smaller as GPS ? ???

  12. Validation with radio sonde data: PAYE • reference: Real-time monitoring • All plots available on http://www.swisstopo.ch/pnac – similar monitoring system as EGVAP with traffic light symbols • Radio sonde data with a time delay available

  13. Availability • Meteo processing and coordinate monitoring closely related • Availability is important: 99.66% LPT_;96.49% LPTR average Last 52 weeks

  14. Example heavy snow fall: PAYE December 2008 - Status PAYE

  15. Example heavy snow fall: PAYE (2) December 2008 – coordinates 20 cm off (height) ! 1 point = 1 hour 1 point = 1 hour 1 point = 30 Seconds (kinem.) Positioning service monitor

  16. Example heavy snow fall: PAYE (3) December 2008 - ZTDs • ZTD parameters are highly biased in case of heavy snow falls – as also the corresponding coordinates…

  17. Example heavy snow fall: PAYE (4) December 2008 – ZTDs eliminated in postprocessing

  18. Example heavy snow fall: PAYE (5) Case 2, January 2009 – picture of the antenna – only a small bias in the coordinates (3 cm in height) • Antennas are quite sensitive to surrounding – replacement of 6 antennas in May 2009 with chokering antennas (after extensive snow tests in the Alps); further antenna replacements planned.

  19. Tomography • GANUWE Project • Swiss project funded by the Swiss Federal Office of the Environment FOEN • Partners: ETH Zurich + MetoSwiss • External partner: swisstopo • Goal: Make tomography usable in numerical weather prediction • Follow up project of phD (Kruse, Troller) and “local networks” (Lutz) • Results prepared by D. Perler (ETHZ)

  20. Improvements Simulation of more satellite systems:gain for GNSS tomography • Data • GLONASS supported • ZTD estimates based on absolute phase center variations • More GNSS stations • Computational • Kalman filter implementation (instead collocation) • Voxel parametrization (constant, multi-linear, spline) • Simulator (point measurements, ZTD, Slant-delay, Double-differences)

  21. GNSS tomography: dataflow measurements GNSS-double-differences swisstopo MeteoSwiss GNSS-ZTD TomographysoftwareAWATOS 2 Weathermodel Surfacemeteo MeteoSwiss Radio sondes Spectrometer

  22. Results with real Data from the GPS Network • Comparison between tomographic solutions and radio sounding observations • Non-constant parameterized solutions have smaller standard deviation than the constant parameterized ones. • Spline/bilinear solution at noon oscillates above 6km.

  23. video Results with data from the GPS network • Outlook: • project with dense network (2-3 km resolution) and low-cost L1 receiver planned

  24. “Climatology” for Geodesists Derived from10 years GPS analysis rise 1 mm/yr downward movement Thank you for your attention

More Related