An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors

  2. LS1 Days: The Injectors • Key Dates • What will run in 2013? • Reminder: What will not be done • What will (should?) be done • How are we organised? • A few more outstanding questions • AD, EAST Area & NORTH Area • Conclusions LS1 Day: The Injectors

  3. Key dates at the start of LS1 PSB LS1 Day: The Injectors

  4. Key dates at the start of LS1 PS LS1 Day: The Injectors

  5. Key dates at the start of LS1 SPS • All services must remain on until the 18th January 2013! (ATLAS water?) • Only works that do not require access and do not affect the operational mode of the SPS will be scheduled before the 21st January 2013! LS1 Day: The Injectors

  6. Key dates at the end of LS1 PS & PSB LS1 Day: The Injectors

  7. Key dates at the end of LS1 SPS LS1 Day: The Injectors

  8. Note for the end of 2014 • LHC will restart with beam in autumn 2014 • It is not planned to have a stop of LHC beam operation at Christmas 2014 • 1 week of standby for LHC & Injectors • Consequences for maintenance activities??? • FT programs will have a normal stop from December 2014 to April 2015. LS1 Day: The Injectors

  9. What will run in 2013? EN/MEF Coordination teams LS1 Day: The Injectors

  10. What will run in 2013? • Main constraint is CV maintenance • PS Complex water off in May, June & July • LINAC3 • Test with new ions for NA61 2014 operation • Mid-January for 13 weeks (Argon) • Early August for 13 weeks (Xenon) • CTF3 • March to November • Stop 3 months in summer • ISOLDE • REX-IBIS • 3MeV test stand • February to April • August to December with a new source LS1 Day: The Injectors

  11. Reminder: What will not be done… LS1 Day: The Injectors

  12. Reminder: What will not be done… • SPS Cable clean up around BA5 • Replacement of irradiated cables BA1 • Replacement of all irradiated cables TCC2 & TDC2 • Look at replacing a limited number of cables to avoid duplication of work and reduce overall dose? • All preparations for the connection of Linac4 to the PSB before LS2 • PSB cable clean-up (requested but never formally agreed) • Some preparatory work to at least identify cables? • EAST Area cabling • NA62 ventilation in NORTH Area • Must be done in the 2014/15 NORTH Area stop LS1 Day: The Injectors

  13. What will be done • Consolidation and maintenance work • all groups • Replacement of PS Complex access system • 28 access points, 100 doors • Both systems to run in parallel during 2014… • The time critical activity • New PSB Interlock system • Replacement of the PS tunnel ventilation system • Requires sealing of PS tunnel & TT2 (not a trivial exercise!) • New PS beam imminent warning system (BIW) • Addition of shielding over the Route Goward at the PS • Major Civil engineering project which will complicated access to the PS area. • Removal of 4 PS main magnets • TT2 magnet renovation LS1 Day: The Injectors

  14. What will be done • Vertical re-alignment of SPS between 5 & 6 • Needs displacement of the support jacks • Full re-alignment of all machines • Replacement of the SPS main power supply transformers • Replacement of approximately 15 SPS main magnets • Change of 12 additional SPS main magnets for e-cloud vacuum chamber coating LS1 Day: The Injectors

  15. How are we organised • Now we have the list of things to do • Aim to produce a first resource loaded realistic schedules for Injectors • Planning and Coordination meetings • Detailed discussions with Groups (dedicated contact people) • Machine Coordinators = the Usual suspects • AD & PSB: Nicolas Gilbert • (PSB: D Hay handover date to be defined) • PS: Ray Brown • SPS: David McFarlane • Other problems concerns: Vinod Chohan or Simon Baird LS1 Day: The Injectors

  16. How are we organised? • We will start from the information already collected and all the approved activities entered into the PLAN database • Please inform us about new activities • Major new activities must also be entered in PLAN • Management approval • IMPACT tool will be used as part of the planning once we have the baseline schedule • Access Control • Activity completion • Documentation control ECR’s etc LS1 Day: The Injectors

  17. How are we organised? A situation to avoid…. LS1 Day: The Injectors

  18. A few outstanding questions to be addressed • No cable clean-up in BA5 • Is there an issue for cabling for new installations around BA5 (SPS) • BI requests…. • No cable clean-up in PSB • Again is there an issue for cabling for new installations • BI equipment • EPC new power converters • Interlock systems • New ABT equipment… • Renovation of TT2 magnets • Can we really remove renovate and re-install up to 39 magnets?? • Can we do this work in situ? LS1 Day: The Injectors

  19. AD (on top of “standard” activities) • RF and Stochastic cooling consolidation • Removal of a main dipole • Preparation of a magnet consolidation program for AD • Removal of unused transfer lines (7000, 8000, ATP) and general clean up to prepare for ELENA • A delay of AD shutdown 2014/15 is under discussion to allow for a delay of… • Additional works for ELENA & Gbar installation • New building (kickers storage etc…) LS1 Day: The Injectors

  20. NORTH Area • NA62 ventilation separation is delayed until 2014/15 North area shutdown • 2014 run for NA62 will need RP mitigation measures • Reduced beam intensity • Long flushing periods before access to experimental cavern • GIF++ installation in H4 • NORTH Area long-term consolidation • Prioritized plan starts in 2013 and continues … • In 2013 TCC2 & TDC2 works (with a limited replacement of irradiated cables t.b.c…) LS1 Day: The Injectors

  21. EAST Area • DIRAC will be removed to make way for a new irradiation facility • This is the first step in the EAST Area renovation as presented at the EAST Area Day LS1 Day: The Injectors

  22. Conclusions • Now we can get started • Business as usual = Coordination meetings… • PS Complex access system is the time critical item • SPS: Two major activities have been removed • Please inform us of changes to your needs (MEF Coordinators and PLAN) • Some questions • BA5 and PSB: Will we install equipment without new cables? • TDC2/TCC2 Can we make a limited cable replacement campaign? • TT2 magnet renovation? • Is non-stop operation from early 2014 to the end of 2015 a concern? • ….. LS1 Day: The Injectors

  23. Conclusions LS1 Day: The Injectors