Multi PMT (12+19 - 3”-sensor) ASSEMBLY STEPS

Multi PMT (12+19 - 3”-sensor) ASSEMBLY STEPS. * Moulding optical layer * Evacuating (0,8 bar abs.) * Apply electronics/cables. Logic board (faraday sh. incl.). Mounting Boards/Cables. Preparing TOP sphere half. TOP sphere half Mounting heatsink. Sealing. Sealing.

svein
Download Presentation

Multi PMT (12+19 - 3”-sensor) ASSEMBLY STEPS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Multi PMT (12+19 - 3”-sensor) ASSEMBLY STEPS * Moulding optical layer * Evacuating (0,8 bar abs.) * Apply electronics/cables Logic board (faraday sh. incl.) Mounting Boards/Cables Preparing TOP sphere half TOP sphere half Mounting heatsink Sealing Sealing Power board Sealing Aligning/connecting BOTTOM- to TOP sphere half Rotating BOTTOM sphere half Preparing BOTTOM sphere half * Moulding optical layer * Evacuating (0,8 bar abs.) * Apply electronics/cables Fixing electronics board BOTTOM sphere half NOTE ! Quality control * Relevant tests between steps * Final test(s) OM ->

More Related