1 / 6

Short-term Travel Time Prediction with Neural Network Models

Short-term Travel Time Prediction with Neural Network Models. ECE 539 Term Project. Wonjae Jang Civil & Environmental Engineering. Project Description. Application of ANN to predict travel time 1-5 time periods ahead for one roadway segment on Beltline highway (3-15 minutes prediction).

sutton
Download Presentation

Short-term Travel Time Prediction with Neural Network Models

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Short-term Travel Time Prediction with Neural Network Models ECE 539 Term Project Wonjae Jang Civil & Environmental Engineering

  2. Project Description • Application of ANN to predict travel time 1-5 time periods ahead for one roadway segment on Beltline highway (3-15 minutes prediction) • Simulation of traffic condition using CORSIM • Comparing results from several models run

  3. Background • Traffic Control • Induce Traffic divergence • Ramp metering • Advance Traveler Information System (Route Guidance System) • Need to predict travel time several time steps ahead • Data Availability • Surveillance systems (CCTV, detector) • Other technologies

  4. Existing Approaches • Use Historical Data • Use Real Time Data • Historical + Real Time (aH(h,t)+(1-a)Rt(t-1)) • ARIMA • Kalman Filtering • ANN

  5. MLP – Back Propagation algorithm was used ANN I Use Lu(t-1), Lt(t-1), Ld(t-1) as input ANN II Use Lu(t-5),…, Lu(t-1), Lt(t-5),…, Lt(t-1), Ld(t-5),…, Ld(t-1) as input ANN III Use L1(t-1), L2(t-1),…, Ln(t-1), Lu(t-1), Lt(t-1), Ld(t-1) w/wo R1(t-1), R2(t-1),…, Rn(t-1) u t d ANN Applied 1 … n u t d 1 n

  6. Results

More Related