slide1
Download
Skip this Video
Download Presentation
The Road from Disaster Impact to Recovery

Loading in 2 Seconds...

play fullscreen
1 / 13

The Road from Disaster Impact to Recovery - PowerPoint PPT Presentation


  • 110 Views
  • Uploaded on

The Road from Disaster Impact to Recovery. Headwinds and. Boulders. The afternoon of October 17 in the Lower Blue Mountains. Residential dwellings destroyed (193) Residential dwellings damaged (110) Damage to grounds and outbuildings (200). In the Upper Blue Mountains.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'The Road from Disaster Impact to Recovery' - sebastian-camacho


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide3
Headwinds

and

Boulders

the afternoon of october 17 in the lower blue mountains
The afternoon of October 17 in the Lower Blue Mountains
  • Residential dwellings destroyed (193)
  • Residential dwellings damaged (110)
  • Damage to grounds and outbuildings (200)
in the upper blue mountains
In the Upper Blue Mountains
  • Residential dwellings destroyed (10)
  • Residential dwellings damaged (2)
  • Damage to grounds and outbuildings (30)
it takes a lot longer to dry out than get wet
It takes a lot longer to dry out than get wet
  • Major impact duration in the Lower Blue Mountains between 7 and 8 hours
  • Estimated duration of major recovery activities 105 days
  • Estimated time before substantial rebuilding takes place 6 to 12 months
  • Estimated time to clear all home sites from date of impact 3.5 months
the psychological effect
The psychological effect
  • The “We survived” syndrome
  • Recognition of the gravity of loss
  • The “Where to Now” syndrome
  • The “Guilt” syndrome
  • The “Why was this allowed to happen” syndrome
scale and magnitude of the recovery operation
Scale and Magnitude of the Recovery Operation
  • Up to 1000 people displaced
  • Loss of all personal possessions
  • 160 + asbestos contaminated sites
  • Loss of personal transport
  • Social disruption
  • Loss of personal communication devices (ipads, mobile phones and internet devices)
  • Immediate decrease of 50% of tourists visiting the region
government and ngo s to the rescue
Government and NGO’s to the rescue
  • State and Federal welfare relief
  • ATO
  • Centrelink
  • Fair Trading
  • Legal Aid
  • Housing
  • Counselling
  • MPES
  • Salvation Army
  • Lions
  • Rotary
  • Water and Utilities
  • RSPCA
  • Police
  • ADF
  • SES
  • RFS
  • DPW
  • EPA
  • WorkCover
  • Roads and Maritime
  • Births, Death and Marriages
  • Red Cross
  • Local Government
  • LPI
  • Tzu Chi Foundation

JUST TO NAME A FEW

the most critical element communications
The most critical element Communications
  • Web page
  • Social media
  • Email
  • Snail mail
  • Public Forums
  • Hardcopy updates
  • Telephone
the generosity of spirit
The generosity of Spirit
  • Donated goods and services
  • What do with 300 sleeping bags when nobody wants to go camping?
  • 6 pallets of tomato soup and 6 giant cans of prunes
  • 500 pillows
  • 1200 cosmetic items
  • Half a tonne of underwear not to mention 500 toothbrushes
  • A lot of shoe polish
  • A few bridesmaids dresses
three tiers of government
Three tiers of Government

The Feds …money, ADF support

The Local …planning issues, development applications, security, traffic control, waste management, recovery staffing and resources, support to residents

The State …money, recovery structure, boots on the ground, policy, facilitation, inter-agency interoperability, recovery staffing and resources, the hard decisions

slide13
Recovery Coordinator

BYE!

Aaaaarrrrgh!!!

ad