1 / 17

Tooele Valley Groundwater Change Application Guidelines

Tooele Valley Groundwater Change Application Guidelines. S. Ross Hansen P.E., L.S. Region Engineer. 9/7/2011 Tooele Water Users Workshop. Overview. History of the Groundwater Change App. Policy. What is the Tooele Valley Groundwater Change Application Policy.

sara-craig
Download Presentation

Tooele Valley Groundwater Change Application Guidelines

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tooele Valley Groundwater Change Application Guidelines S. Ross Hansen P.E., L.S. Region Engineer 9/7/2011 Tooele Water Users Workshop Surveying principles

  2. Overview • History of the Groundwater Change App. Policy. • What is the Tooele Valley Groundwater Change Application Policy. • Conceptual Future Groundwater Flow. • Future Change App. Administration. Surveying principles

  3. Vocabulary • Acre-foot - An acre of land 1’ deep water • CFS - Cubic Feet per Second • G.W. – Groundwater • POD – Point of Diversion • S.E. – State Engineer • State Engineer’s Office a.k.a. Division of Water Rights • UGS - Utah Geological Survey • USGS – United States Geological Survey Surveying principles

  4. Tooele Map Surveying principles

  5. History of the Groundwater Change Policy • In 2007 we were inundated with cross valley change application filings • Meeting were held on: • August 28, 2007 S.E. expressed concern that moving multiple paper rights to the East side of the valley could cause future interference issues. • April 24, 2008 to propose a change application policy be implemented • Comments were submitted pursuant to the meeting • July 22, 2008 to implement the policy. • Effective date of policy April 16, 2008 Surveying principles

  6. Understanding the Tooele Valley Groundwater Change Application Policy • How it was derived • Policy summary • What it does • What it doesn’t Surveying principles

  7. Hydrologic ConnectionRecharge / Discharge Surveying principles

  8. Total Recharge: 75,297 Total Permitted Use: 83,969 Total Difference: -8,672 Percent over: 12% Water Right Distribution Recharge: 16,910 Permitted Use: 27,404 Difference: -10,494 Percent over: 62% Recharge: 43,160 Permitted Use: 48,595 Difference: -5,435 Percent over: 13% Recharge: 15,226 Permitted Use: 7,970 Difference: 7,257 Percent under: 48% Surveying principles

  9. Tooele Valley Groundwater Change Application Policy • Policy Summary • Can’t Cross Into Eastern Zone • Buffer 3 Miles East Perpendicular to Flow Path • Change App. Specifics • Multiple Water Rights • Each Water Right Will Be Evaluated Individually • Most Restrictive Water Right Will Govern • Multiple Points of Diversion • Based On Eastern Most Well • Applications Will Still Be Considered On Their Own Merit Surveying principles

  10. 3 mile Map graphically showing 3 mile buffer and East zone Surveying principles

  11. Understanding the Tooele Valley Groundwater Change Application Policy • What the policy does: • Creates some semblance of order and certainty • Allows WR holders to predict outcome before filing • Allows the S.E. to make more timely decisions on change application • Protects the East side from further over- appropriation • Stops future interference issues Surveying principles

  12. Understanding the Tooele Valley Groundwater Change Application Policy • What the policy does not: • It does not “divide” the valley into 3 sections • The SE continues to administer the valley as one hydrologic system • It is not the “end all” answer when considering change applications • Each application is considered on its own merits Surveying principles

  13. Total Recharge: 75,297 Total Permitted Use: 83,969 Total Difference: -8,672 Percent over: 12% Water Right Distribution Recharge: 16,910 Permitted Use: 27,404 Difference: -10,494 Percent over: 62% Recharge: 43,160 Permitted Use: 48,595 Difference: -5,435 Percent over: 13% Recharge: 15,226 Permitted Use: 7,970 Difference: 7,257 Percent under: 48% Surveying principles

  14. Hydrologic ConnectionFuture conceptual drawing Surveying principles

  15. Future of Change Application Administration • Continue to administer and make decisions based on current policy • If data is brought before us we will consider it and incorporate if need be Surveying principles

  16. Where to Get More Policy Info. • Water Rights web site • http://waterrights.utah.gov/ Surveying principles

  17. QUESTIONS?? Thank you Surveying principles

More Related